WWYK240015 - Rehab Tanks 62501E & 62501W

DEPT OF DEFENSE FA813726R0020
Response Deadline
Jun 2, 2026
13 days left
Days Remaining
13
Until deadline
Set-Aside
Full & Open
Notice Type
Solicitation

Contract Opportunity Analysis

The U.S. Air Force, through AFSC PZIOC at Tinker Air Force Base, is seeking offers for the rehabilitation of Tanks 62501E and 62501W at the Tinker AFB Industrial Waste Treatment Plant. The work includes replacing the cathodic protection system, updating electrical work for the raised platform, stripping and replacing interior tank components and piping to the four controlling valves, and cleaning and recoating exterior stairs, the platform, and associated structures. The project is limited to Tinker AFB MAC-BOA holders, requires coordination around a phased approach with only one tank offline at a time, and calls for contractor-provided design and safety deliverables that support construction, confined-space entry, and quality control. Proposals are due June 2, 2026 at 2:00 PM local time, and submissions are to be sent to SSgt Isaac Demmers by email.

Classification Codes

NAICS Code
236220
Commercial and Institutional Building Construction
PSC Code
Z2ND
REPAIR OR ALTERATION OF SEWAGE AND WASTE FACILITIES

Solicitation Documents

7 Files
WWYK240015 - RFI RESPONSES.pdf
PDF422 KBMay 19, 2026
AI Summary
This government file details responses to numerous questions regarding the rehabilitation of Tanks 62501E and 62501W at Tinker AFB, OK. Key aspects covered include contractor responsibilities for design elements, structural reviews, disposal of construction waste (confirmed as hazardous for blasting debris), and compliance with various specifications (e.g., SSPC Guide 6, 09 97 13.16, 09 97 13.27, 00 72 00). The government will handle tank draining, sludge removal, and initial cleaning, providing a 14-day notice. Specific requirements for cathodic protection design, coating systems (with 3 to 5-year warranties), and outage plans are outlined. The contractor is responsible for a rescue plan for confined space entry and the installation, alignment, testing, and recommissioning of cranes, pumps, and mixers. The project anticipates 2-4 months per tank, with the government reserving the right to take control in emergencies. All design elements provided by the contractor must be sufficient for construction, signed/sealed, and approved by the government, with liability remaining with the contractor.
Solicitation - FA813726R0020.pdf
PDF700 KBMay 19, 2026
AI Summary
The U.S. Air Force, through AFSC PZIOC at Tinker AFB, issued Solicitation Number FA813726R0020 on April 17, 2026, for the rehabilitation of Tanks 62501E and 62501W at the Tinker AFB Industrial Waste Treatment Plant. This negotiated Request for Proposal (RFP) is exclusively for current MAC-BOA holders and involves replacing cathodic protection, electrical systems for a raised platform, and stripping/recoating tank interiors and exterior structures. The project, estimated between $1,000,000 and $5,000,000, requires performance within 310 calendar days of receiving notice to proceed, with a mandatory 10-day period for performance and payment bonds. Offers are due by 2:00 PM local time on June 2, 2026. The solicitation includes clauses for electronic payment via Wide Area WorkFlow (WAWF), liquidated damages of $237.96 per day for delays, and a Buy American provision for construction materials. An ombudsman is available for concerns.
Wage Determination - 1 Jan 26.pdf
PDF172 KBMay 19, 2026
AI Summary
The document appears to be a highly technical government file, likely related to a Request for Proposal (RFP) or a grant application, detailing specifications for various systems and processes. It includes sections with what seem to be codes or identifiers, percentage breakdowns, and detailed instructions or parameters for different operational aspects. Key areas touched upon include system configurations, operational procedures, compliance requirements, and safety protocols. The fragmented nature and use of special characters suggest a focus on precision and technical adherence, typical in government contracts. The document outlines a structured approach to project execution, emphasizing specific controls and guidelines for implementation across multiple components.
Att12_240015-Drawings.pdf
PDF20959 KBMay 19, 2026
AI Summary
This government file outlines the rehabilitation project for tanks 62501E and 62501W at Tinker Air Force Base, Oklahoma. The project details structural, mechanical, and electrical work, focusing on tank preparation, coating, and concrete repairs. Key aspects include abrasive blasting and applying new three-part epoxy coating systems to both interior and exterior tank surfaces, adhering to specific thickness requirements. Structural repairs involve addressing concrete cracking and monolith joints according to ACI RAP-1 and ACI RAP-6 standards, replacing sealant, stair nosing, platform grating, and pipe supports. Electrical work mandates the demolition of the existing cathodic protection system and installation of a new one, including titanium mixed metal oxide anodes, reference electrodes, and an automatically controlled rectifier. The contractor is responsible for verifying existing conditions, ensuring proper containment during abrasive blasting and painting, and adhering to strict quality assurance measures for all repairs and installations.
Att10_240015_Statement of Work.final.pdf
PDF287 KBMay 19, 2026
AI Summary
This Statement of Work (SOW) outlines the requirements for rehabilitating Tanks 62501E and 62501W at Tinker Air Force Base (AFB), Oklahoma. The project, WWYK240015, involves replacing internal coatings, repairing/replacing cathodic protection, and repairing secondary containment seals due to corrosion and failed components. The contractor is responsible for furnishing all materials, labor, and services, including site investigation, logistical planning, and waste disposal. Key personnel, such as Project Manager, Quality Control Manager, and Site Safety and Health Officer, must meet specific experience requirements. The work will be phased, with only one tank taken offline at a time, and must adhere to strict quality control, health, and safety regulations, including OSHA VPP and EM 385-1-1. The contractor must also comply with environmental regulations, submit detailed schedules and progress reports, and follow specific documentation and drawing standards. All work will be performed during normal duty hours, with exceptions for utility outages, and requires coordination with government personnel for access and approvals.
Att11_240015_Submittal Register.pdf
PDF185 KBMay 19, 2026
AI Summary
This government file outlines a comprehensive submittal register for the "REHAB TANKS 62501E & 62501W" project, contract WWYK240015. It details an extensive list of required documentation across various stages of construction, including pre-construction, product data, shop drawings, design data, test reports, certificates, manufacturer's instructions, operation and maintenance data, and closeout submittals. Key areas covered include health and safety plans, environmental management, construction scheduling, quality control, concrete work, welding, steel erection, sealants, and coating work. The document specifies general government review (G) for many items and includes remarks on submission frequencies and specific requirements, such as providing electronic and hard copies for manuals and drawings. The register serves as a critical guide for contractors to ensure compliance and proper project execution by detailing all necessary submissions and their classifications.
WWYK240015 - Site Visit Sign In Sheet.jpg
JPEG85 KBMay 19, 2026
AI Summary
The MAC - BOA Site Visit document details an initial site visit conducted on April 24, 2026, for Project WWYK240015, titled "Rehab Tanks 62501E & 62501W." This event is part of the pre-proposal phase for a government contract, with the RFI due on May 1, 2026, and the proposal due on June 2, 2026. The document lists numerous attendees from various organizations, including prime contractors and subcontractors, indicating a significant level of interest and participation from diverse companies. Key organizations include Maguire Ottaca, The HR Group, Trade Mechanical, Diversified, CESCO, TERA, NS6, TEPA/CE, Griffith, LOG, Miami Nation Stronghold, Warden CC, GAMLAHt-CALLAHAN, Southwine, and PZIOC. The attendance list also clarifies whether each organization is a prime contractor or a subcontractor, providing insight into the project's potential bidding structure. This site visit serves as a crucial preliminary step for potential bidders to understand the project requirements and scope before submitting their proposals.

Related Contract Opportunities

Project Timeline

postedOriginal Solicitation PostedApr 17, 2026
amendedAmendment #1· Description UpdatedApr 24, 2026
amendedLatest Amendment· Description UpdatedMay 19, 2026
deadlineResponse DeadlineJun 2, 2026
expiryArchive DateJun 17, 2026

Agency Information

Department
DEPT OF DEFENSE
Sub-Tier
DEPT OF THE AIR FORCE
Office
FA8137 AFSC PZIOC

Point of Contact

Name
Isaac Demmers

Place of Performance

S Coffeyville, Oklahoma, UNITED STATES

Official Sources