LAKE SINCLAIR DUMP STATION REPAIR
Contract Opportunity Analysis
The USDA Forest Service, through the Chattahoochee Oconee National Forest, is seeking quotes for the Lake Sinclair Dump Station Repair project to repair a damaged septic drain line at an RV dump station in Eatonton, Georgia. The work includes cutting and removing concrete, trench excavation, jackhammering as needed, replacing the damaged pipe and fittings, backfilling, pouring new concrete, and completing soil erosion control and site stabilization, with optional replacement of barrier logs, pole logs, and signposts. This is a total small business set-aside under NAICS 562998, with performance planned from June 8, 2026, to August 1, 2026, and evaluation focused on the most technically advantageous solution, fair and reasonable pricing, and acceptable past performance. Quotes are due by May 29, 2026, at noon ET and should be sent to Marian Feist at marian.feist@usda.gov.