Amendment 0002 to Solicitation FA282325R0023, issued by AFTC PZIO at Eglin AFB, FL, extends the proposal due date to September 24, 2025, by 14:00 CST. This extension accommodates adjustments to the Pricing Matrix based on responses to initial questions. Key changes include correcting the number of units for Line Items 1031AA and 1031AB on the Pricing Matrix from 10,000 SF to 100,000 SF, and 50,000 SF to 500,000 SF, respectively. Additionally, the unit of measure for Line Item 1081 Reflectometer is clarified to represent a 6' x 6' area (36 SF increments), covering the same total area as previously specified. Attachment L1 Paving IDIQ Pricing Matrix Rev01 (dated September 17, 2025) replaces the previous version. All other terms and conditions remain unchanged.
This government file, revised September 17, 2025, outlines a comprehensive unit price schedule for various construction and engineering services over a five-year period with a six-month extension. The file details a wide range of items, including milling and grading of asphalt, rough and fine grading for roads, parking lots, sidewalks, cart paths, swales, and drainage areas. It also covers the installation of limerock base and graded aggregate, compaction of subgrades, bulk and hand excavation, and various types of fill. The document specifies asphalt and concrete work, including sawcutting, paving, and the application of prime and tack coats, with different asphalt types for traffic levels and airfields. Additional services encompass material hauling, concrete and sidewalk removal and installation, curb work, PCC paving, expansion joints, and a variety of permanent and temporary reflective and non-reflective striping and pavement markings, including those for airfields and handicap symbols. Drainage infrastructure includes manhole and valve box adjustments, various pipe installations (RCP, CMP, HDPE), headwalls, and concrete structures. Erosion control measures like riprap and silt fences are listed, alongside landscaping such as sodding and seeding. The file also details runway maintenance, including paint and rubber removal, light adjustments, and surface friction testing. Finally, it includes engineering services covering civil, geo-technical, environmental, structural, and electrical engineering, architectural design, drafting, land surveying, and administrative support. Each item is listed with estimated quantities and units of issue, but all price per unit and total amount fields are marked as $0.00.