Renovation of the Fish Collection Facility on the Toutle River
Contract Opportunity Analysis
The U.S. Army Corps of Engineers, Portland District, within the Department of the Army, is seeking market research information for the renovation of the Fish Collection Facility on the Toutle River in Washington. The project will renovate the existing facility to meet current BiOP requirements and includes installation of a new SCADA system with hardware and software to monitor and maintain water levels for the fish ladder. The work requires PLC equipment compatible with Allen Bradley Studio 5000 and includes analog and digital input and output modules, relay outputs, an Ethernet/IP main controller on CAT6 hardware, a 15-inch HMI, and VFDs or ASD for motors from 3 hp to 50 hp, with the location of performance in Toutle, Washington. Responses are limited to six pages and should identify the equipment make and model, list relevant project experience, and show the PLC can run Allen Bradley Studio 5000 software; interested vendors must submit brochures and capability information by 25 May 2026 at 11:00 AM PDT to Justin F. Figueredo and David M. Cook, and firms must be registered in SAM.