ContractCombined Synopsis/Solicitation

Overhaul (soft kits only) and testing of Marotta valves

DEPT OF DEFENSE N6883626Q0026
Response Deadline
May 26, 2026
6 days left
Days Remaining
6
Until deadline
Set-Aside
No Set aside used
Notice Type
Combined Synopsis/Solicitation

Contract Opportunity Analysis

The Department of the Navy, through NAVSUP Fleet Logistics Center Jacksonville, is seeking overhaul and testing services for Marotta valves to restore mission-capable status. The contractor must provide all labor, facilities, equipment, and OEM materials for seven RM11HB-6B valves and two RM11MA valves, including inspection, disassembly, cleaning, replacement of soft parts, reassembly, and comprehensive testing. If hard part repairs are needed, the contractor must submit a Condition Found Report and revised quote, and the work is to be performed off-site at Moody Marine Services with a required quality management system. Turnaround is 15 to 30 days for simultaneous receipt or 30 to 45 days after receipt for staggered delivery, packaging must meet MIL-STD-2073-1, return shipping is the contractor’s responsibility, and payment will be made by electronic funds transfer; the primary contacts are Ricardo Murillo and Jodi McCarty.

Classification Codes

NAICS Code
336611
Ship Building and Repairing
PSC Code
J999
NON-NUCLEAR SHIP REPAIR (WEST)

Solicitation Documents

2 Files
rev2 STATEMENT OF WORK.docx
Word32 KBMay 20, 2026
AI Summary
This Statement of Work (SOW) outlines the requirements for overhauling and testing nine Marotta valves from the USS Sullivans DDG 68. The contractor must provide all labor, facilities, equipment, and OEM materials to return seven RM11HB-6B and two RM11MA valves to fully mission-capable status. The repairs are necessary due to manifold malfunctions impacting Gas Turbine Engines and exceeding Planned Maintenance Periodicity. The scope includes preliminary inspection, disassembly, cleaning, replacement of all soft parts with OEM materials, and comprehensive testing. If hard part repairs are needed, a Condition Found Report (CFR) and revised quote are required within five business days. Reassembled valves will be rigorously tested, tagged with test pressure, date, part, and serial numbers, and returned to the government. Deliverables include the CFR, the overhauled valves, and test reports with a Certificate of Conformance (CoC). The work will be performed off-site at Moody Marine Services with a turnaround time of 15-30 days for simultaneous receipt or 30-45 days ARO for staggered receipt. Packaging must comply with MIL-STD-2073-1, and the contractor is responsible for return shipping. A Quality Management System is required, and payment will be via Electronic Funds Transfer.
solicitation N6883626Q0026 2.pdf
PDF22052 KBMay 20, 2026
AI Summary
This government form,

Related Contract Opportunities

Project Timeline

postedOriginal Solicitation PostedMay 20, 2026
deadlineResponse DeadlineMay 26, 2026
expiryArchive DateJun 10, 2026

Agency Information

Department
DEPT OF DEFENSE
Sub-Tier
DEPT OF THE NAVY
Office
NAVSUP FLT LOG CTR JACKSONVILLE

Point of Contact

Name
Ricardo Murillo

Place of Performance

Florida, UNITED STATES