ContractCombined Synopsis/SolicitationTotal Small Business Set-Aside (FAR 19.5)

Bathroom Renovations for USCG STATION SANTA BARBARA RESIDENCIES

DEPARTMENT OF HOMELAND SECURITY 31100PR260000015
Response Deadline
Jan 29, 2026
Deadline passed
Days Remaining
0
Closed
Set-Aside
Total Small Business Set-Aside (FAR 19.5)
Notice Type
Combined Synopsis/Solicitation

Contract Opportunity Analysis

The Department of Homeland Security, through the United States Coast Guard, is soliciting proposals for the renovation of bathroom facilities at the Santa Barbara Housing Units. The project entails the removal and replacement of six failing bathtub and shower pan assemblies, which have developed cracks due to improper installation, necessitating standardized replacements to ensure durability and maintenance efficiency. This renovation is critical for maintaining the quality of living conditions in occupied housing units, and contractors must comply with current building codes and project specifications. Interested parties should contact Ryan H. King at ryan.h.king2@uscg.mil or 619-943-5942 for further details, and are encouraged to attend an industry open house site visit on January 6th at 0900. Proposals must include documentation of past performance and certifications, with evaluations based on technical capability, past performance, and price.

Classification Codes

NAICS Code
236118
Residential Remodelers
PSC Code
Z1FA
MAINTENANCE OF FAMILY HOUSING FACILITIES

Solicitation Documents

3 Files
Bathroom Remodel-SPECS.pdf
PDF28 KBJan 23, 2026
AI Summary
The document outlines project specifications for bath renovations, likely part of a government Request for Proposal (RFP) or grant. It details work for "Bath One" and "Bath Two," including the installation of client-supplied vanities, vanity lights, medicine cabinets, and toilets for seven units in Bath Two. Drywall repair is specified for 300 sq ft in Bath Two. For Bath One, the project includes plumber and delivery charges for eight complete units, a permit fee for Los Angeles, and the installation of seven white 35x35 neo-angle shower bases. Additionally, Bath One will receive one 5.5 ft white custom sprayfoam tub, six white shower systems, seven chrome Moen Eva Posi-Temp pressure-balanced shower trims, one chrome Moen Eva Posi-Temp pressure-balanced tub and shower trim, one chrome curved round shower rod, and one white four-shelf tower caddy. The document emphasizes color coordination and specific product models.
Shower Pan Work - Redacted.pdf
PDF362 KBJan 23, 2026
AI Summary
Toro Construction provided an estimate to the United States Coast Guard for a shower pan replacement and tub-shower conversion project. The scope of work includes prep-work such as removing shower doors and tiles, and demolishing a tub-shower stall. Plumbing work involves installing new shower drains, fiberglass shower pans, and a new shower faucet. Drywall patching and matching existing texture are also included. Tile work focuses on shower pan replacement, waterproofing exposed walls, and installing new shower tile substrate and waterproofing. The project also accounts for a temporary toilet for workers and project management to schedule, organize, and ensure the quality of tasks.
SOW BUILDING SB SHOWERS.docx
Word1857 KBJan 23, 2026
AI Summary
The Department of Homeland Security, United States Coast Guard, is soliciting proposals for the replacement of six failing bathtub and shower pan assemblies at their Santa Barbara Housing Units. The project addresses existing units with cracked drains due to inadequate structural support during original installation. The scope of work includes the removal of old units and associated materials, inspection and repair of subfloor, structural, and wall assemblies, and plumbing verification. New standardized tub/shower units, surrounds, and hardware will be installed, followed by finishes and restoration. The contractor is responsible for all labor, materials, equipment, and supervision, ensuring compliance with building codes and standardization requirements across all six occupied units. Key requirements include a site visit, standardized materials submission, work schedule approval, and protective measures for occupied units. Quality control, safety, and adherence to specific site access and working hour regulations are mandatory. Bids must provide a cost breakdown for labor and materials, and contractors must be registered with SAM.gov.

Related Contract Opportunities

Project Timeline

postedOriginal Solicitation PostedDec 19, 2025
amendedAmendment #1· Description UpdatedDec 29, 2025
amendedAmendment #2· Description UpdatedDec 30, 2025
amendedAmendment #3Jan 6, 2026
amendedLatest AmendmentJan 23, 2026
deadlineResponse DeadlineJan 29, 2026
expiryArchive DateFeb 12, 2026

Agency Information

Department
DEPARTMENT OF HOMELAND SECURITY
Sub-Tier
US COAST GUARD
Office
BASE LOS ANGELES/LONG BEACH(00037)

Point of Contact

Name
Ryan H. King

Place of Performance

Santa Barbara, California, UNITED STATES

Official Sources