ContractSolicitation

Tinker AFB MAC BOA - WWYK240176 - REPLACE INDUSTRIAL WASTE LIFT STATIONS 6N & 6S, B62501

DEPT OF DEFENSE FA813726R0012
Response Deadline
May 15, 2026
7 days left
Days Remaining
7
Until deadline
Set-Aside
Full & Open
Notice Type
Solicitation

Contract Opportunity Analysis

The Department of the Air Force, through FA8137 AFSC PZIOC at Tinker Air Force Base, is seeking a design-build contractor to replace Industrial Waste Lift Stations 6N and 6S at Building 62501 in support of Tinker AFB MAC BOA holders. The work includes furnishing all design and engineering services, materials, labor, equipment, testing, quality control, and incidental work needed to demolish and replace the industrial waste lift stations, with consideration of future flows, possible consolidation of the lift stations, and potential reuse or rehabilitation of the wet well structure. The project calls for continuous operation of the industrial waste system during phased construction and includes detailed requirements for key personnel, environmental controls, hazardous-area electrical work, and closeout deliverables such as record drawings, O&M manuals, training, and a DD Form 1354. Proposals are due by 21 May 2026 at 1300, and submissions are to be sent to SSgt Isaac Demmers with Tamra Torres copied.

Classification Codes

NAICS Code
236220
Commercial and Institutional Building Construction
PSC Code
Z2PD
REPAIR OR ALTERATION OF WASTE TREATMENT AND STORAGE FACILITIES

Solicitation Documents

19 Files
WWYK240176 - Site Visit Sign In.jpg
JPEG98 KBMay 8, 2026
AI Summary
The document is an attendance sheet for an initial site visit held on February 24, 2026, at 10:00 AM, concerning Project WWYK240176, titled "Replace Industrial Waste Lift Stations 6N & 65 B62501." The proposal due date is March 6, 2026. The list includes attendees from various organizations, indicating a pre-solicitation meeting for a government Request for Proposal (RFP) or contract. The attendees represent prime contractors, subcontractors, and other interested parties in the construction or engineering sector. This site visit is crucial for potential bidders to understand project requirements, site conditions, and ask questions before submitting their proposals for this federal government project.
Site Visit Meet-up Point.png
PNG2601 KBMay 8, 2026
AI Summary
The document provides geographical information for
240176_ATT09_SOW.pdf
PDF316 KBMay 8, 2026
AI Summary
This Statement of Work (SOW) outlines the requirements for replacing industrial waste lift stations 6N and 6S at Tinker Air Force Base (AFB), Oklahoma. The project, WWYK240176, involves furnishing all design/engineering services, materials, labor, and equipment. The contractor must perform site investigations, identify logistical, architectural, and structural work elements, and provide a complete, functioning system. Key personnel, including a Project Manager, Design Project Manager, Quality Control Manager, Site Safety and Health Officer, and Project Superintendent, are required with specific experience levels. The SOW details requirements for contractor personnel, badges, quality control, health and safety, bioenvironmental regulations, utility outages, and protection of existing work. Project-specific requirements include government occupancy coordination, working hours, construction sequencing, FOD awareness training, and environmental management surveys for potential hazardous materials. The document also specifies correspondence, documentation formats, design/construction schedule, progress reporting, design/engineering submittals, and a design-build approach with detailed civil, plumbing, and electrical demolition and construction requirements. An order of precedence is provided for conflict resolution, along with requirements for record drawings, O&M manuals, training, and DD Form 1354. Government-furnished drawings, specifications, reference documents, and as-built information are included, with no government-furnished property. The SOW also addresses staging/storage areas and an "or equal" clause for material substitutions.
240176_ATT03_Green_Procurement_Statement.pdf
PDF278 KBMay 8, 2026
AI Summary
Gloria Butcher, Project Manager for Tinker Air Force Base, submitted a Green Procurement Statement for Project WWYK240176, "REPLACE INDUSTRIAL WASTE LIFT STATIONS 6N & 6S, B62501." The statement confirms that none of the specified products are on mandatory environmental purchasing lists from the U.S. EPA, USDA Bio-based product listings, Energy Star®, or FEMP Low Standby Power product listings. Consequently, a Recovered Material Determination Form is not required. Butcher also stated that environmentally preferable products and services were considered where feasible, weighing factors like price, performance, availability, and safety. This included products with recycled or bio-based content and attributes such as reduced packaging, durability, reduced toxicity, conservation of natural resources, water conservation, low VOC content, asbestos alternatives, recyclability, and alternative fuels. The statement was signed on September 25, 2025.
240176_ATT04_Ozone_DS.pdf
PDF157 KBMay 8, 2026
AI Summary
A memorandum from the Department of the Air Force, dated September 25, 2025, addresses requirement WWYK240176, concerning the replacement of industrial waste lift stations 6N and 6S at Building 62501. The document confirms that the project, reviewed by technical personnel, does not necessitate the contractor's use or delivery of Class 1 Ozone Depleting Substances (ODS) as identified in Air Force Policy. The memo is signed by Gloria Butcher, Project Manager for Tepa Companies, and is digitally certified.
Solicitation Amendment - FA813726R00120001.pdf
PDF89 KBMay 8, 2026
AI Summary
This government solicitation, FA813726R00120001, issued by the Air Force Materiel Command, seeks proposals for the replacement of industrial waste lift stations 6N and 6S at Tinker Air Force Base, Oklahoma. The project, titled "WWYK240176 REPLACE INDUSTRIAL WASTE LIFT STATIONS 6N AND 6S, B62501," involves comprehensive design, engineering, material, labor, and equipment to demolish and replace the existing lift stations. The estimated magnitude of the project is between $1,000,000 and $5,000,000. Key requirements include considering future flows, potentially combining the lift stations, and rehabilitating wet well structures. The contractor must begin performance within 10 calendar days and complete it within 495 calendar days after receiving notice to proceed, with mandatory performance and payment bonds required within 10 calendar days of award. Offers are due by May 4, 2026, at 1:00 PM local time. The solicitation incorporates various FAR and DFARS clauses, including provisions for liquidated damages of $227.75 per day for delays, post-award small business program rerepresentation, Buy American—Construction Materials, and Wide Area WorkFlow (WAWF) payment instructions.
Solicitation - FA813726R0012.pdf
PDF406 KBMay 8, 2026
AI Summary
The solicitation FA813726R0012 is for the replacement of industrial waste lift stations 6N and 6S at Tinker Air Force Base, Oklahoma. The project, titled "WWYK240176 REPLACE INDUSTRIAL WASTE LIFT STATIONS 6N AND 6S, B62501," involves design/engineering services, material, labor, and equipment for demolition and replacement. The estimated magnitude of the project is between $1,000,000 and $5,000,000. Key details include a performance period of 495 calendar days, a requirement for performance and payment bonds within 10 days of award, and an offer due date of April 27, 2026, at 02:30 PM local time. The contract is a 100% small business set-aside with a NAICS code of 236220 and a size standard of $45,000,000.00 annual receipts. It includes clauses on liquidated damages ($227.75 per day of delay), Buy American provisions for construction materials, and detailed instructions for electronic payment submissions via Wide Area WorkFlow (WAWF). The document also outlines the availability of an Ombudsman for concerns related to the acquisition.
240176_Amendment 1 Drawings.pdf
PDF3372 KBMay 8, 2026
AI Summary
This government file outlines the project to replace industrial waste lift stations 6N and 6S at Tinker Air Force Base, Oklahoma (Project WWYK240176). The project involves the demolition of existing lift stations and the installation of a new, consolidated industrial waste lift station (IWLS) and valve vault (IWVV) to improve waste management. Key aspects include rerouting discharge from lift station 6S to 6N, constructing a 5,000-gallon capacity sump with three submersible pumps, and integrating a robust control system for lead/lag capability, alarms, and flow metering. The contractor is responsible for field verification of existing conditions, adherence to environmental regulations for hazardous materials like asbestos and lead-based paint, and ensuring continuous operation of the industrial waste system throughout the phased sequence of work. The project also details site improvements such as concrete driveways, walkways, and gravel placement for maintenance access.
240176_PRE-BID RFI RESPONSES - COR Signed.pdf
PDF876 KBMay 8, 2026
AI Summary
The Department of the Air Force's 72 ABW/CEED responded to 55 pre-bid Requests for Information (RFIs) regarding Project WWYK240176,
Solicitation Amendment - FA813726R00120002.pdf
PDF390 KBMay 8, 2026
AI Summary
Amendment 0002 to Solicitation FA813726R0012, effective April 3, 2026, extends the proposal due date from May 4, 2026, to May 15, 2026, both at 13:00 (1:00 PM). Issued by FA8137 AFSC PZIOC at Tinker AFB, OK, this amendment also modifies the
240176_STATEMENT OF WORK-Amendment 1.pdf
PDF318 KBMay 8, 2026
AI Summary
The Statement of Work (SOW) outlines the replacement of industrial waste lift stations 6N and 6S at Tinker Air Force Base (AFB), Oklahoma. The project, WWYK240176, requires the contractor to furnish all design/engineering services, materials, labor, and equipment. Key personnel, including a Project Manager, Design Project Manager, Quality Control Manager, Site Safety and Health Officer, and Project Superintendent, must meet specific experience and licensing requirements. The SOW details contractor personnel requirements, badge procedures, quality control, health and safety regulations, environmental considerations (including potential asbestos/lead-based paint and soil contamination), and utility outage protocols. It also specifies documentation standards, file naming conventions, and a detailed design/construction schedule with defined government review times for various submittals. The design-build approach requires adherence to numerous Unified Facility Criteria (UFCs) and Tinker AFB standards. The contractor is responsible for civil, plumbing, and electrical demolition and construction, with specific requirements for each. Post-construction, the contractor must provide record drawings, Operations & Maintenance manuals, training, and a DD Form 1354. The document includes appendices for drawings, specifications, and reference documents.
240176_Amendment 1 letter_Signed.pdf
PDF167 KBMay 8, 2026
AI Summary
The Department of the Air Force, Headquarters 72 Air Base Wing, issued an amended solicitation for Project WWYK240176,
240176_ATT10_Design_Narrative.pdf
PDF3971 KBMay 8, 2026
AI Summary
The Design Narrative outlines the replacement of Industrial Waste Lift Stations 6N and 6S at Building 62501, Tinker Air Force Base, Oklahoma. The project involves demolishing existing infrastructure and installing new, compliant lift stations with enhanced mechanical, electrical, and civil components. Key upgrades include a new wet well, submersible pumps, containment piping, improved screening, and integration with the base monitoring system. Civil design focuses on rerouting flow, site preparation, grading, and drainage improvements, while structural elements adhere to specific concrete and steel standards. Mechanical and plumbing work details pump specifications and installation, and electrical upgrades cover power distribution, controls, and safety measures. The project prioritizes continuous operation by sequencing construction to keep one lift station active at all times, ensuring adherence to numerous federal and local codes and standards.
240176_ATT12_ Drawings.pdf
PDF3069 KBMay 8, 2026
AI Summary
This government file outlines the replacement project for industrial waste lift stations 6N and 6S at Tinker Air Force Base, Oklahoma. The project, designated WWYK240176, involves the demolition of existing infrastructure and the installation of a new industrial waste lift station (IWLS) and associated valve vaults (IWVV). Key aspects include consolidating waste flows from station 6S into the new 6N system, installing a 5,000-gallon capacity wet well with three submersible pumps, and implementing a sophisticated plumbing control system with lead/lag capabilities and extensive alarming. The electrical work is classified as a hazardous area, requiring explosion-proof equipment and strict adherence to NEC articles. The project emphasizes continuous operation, environmental compliance for waste disposal, and adherence to Tinker AFB standards and UFC guidelines.
240176_ATT11_Submittal_Register.pdf
PDF142 KBMay 8, 2026
AI Summary
The document is a Submittal Register for the "Replace Industrial Waste Lift Stations 6N & 6S" project at Tinker AFB, B62501. It outlines required submittals for government or A/E review, categorized by specification section and description. Key submittal types include preconstruction, closeout, test reports, certificates, product data, design data, manufacturer's instructions, and operation/maintenance data. Important items include entry access lists, health and safety plans, environmental plans, baseline construction and design schedules, quality control plans, design data, and various closeout documents like as-built drawings and operation and maintenance manuals. The register also specifies review classifications (G, C, R), paragraph references, and remarks for certain items, such as providing monthly reports or electronic/hard copies. This comprehensive list ensures adherence to project specifications and regulatory requirements for the replacement of industrial waste lift stations.
240176_ATT11_Submittal_Register.xlsx
Excel20 KBMay 8, 2026
AI Summary
The document is a Submittal Register for the "Replace Industrial Waste Lift Stations 6N & 6S" project at Tinker AFB, B62501. It outlines required submittals for government or A/E review, categorized by specification section and description. Key submittal types include preconstruction, closeout, test reports, certificates, product data, design data, manufacturer's instructions, and operation/maintenance data. Important items include entry access lists, health and safety plans, environmental plans, baseline construction and design schedules, quality control plans, design data, and various closeout documents like as-built drawings and operation and maintenance manuals. The register also specifies review classifications (G, C, R), paragraph references, and remarks for certain items, such as providing monthly reports or electronic/hard copies. This comprehensive list ensures adherence to project specifications and regulatory requirements for the replacement of industrial waste lift stations.
Solicitation Amendment FA813726R00120003 SF 30.pdf
PDF385 KBMay 8, 2026
AI Summary
Amendment 0003 to Solicitation FA813726R0012, effective April 3, 2026, extends the proposal due date from May 15, 2026, at 1300 (1:00 PM) to May 21, 2026. This amendment, issued by FA8137 AFSC PZIOC at Tinker AFB, OK, is a standard modification for federal government RFPs. All other terms and conditions of the original solicitation remain unchanged. Offerors must acknowledge receipt of this amendment to ensure their offers are considered valid.
WWYK240176 - Additional Site Visit Sign in Sheet.jpg
JPEG86 KBMay 8, 2026
AI Summary
The document details a supplemental site visit conducted on May 8, 2026, for Project/WO #WWYK240176, titled "Replace Industrial Waste Lift Stations." The site visit was held at 0830, and the RFI due date is May 12, 2026, with the proposal due date to be announced on SAM.gov. The attendance log lists various individuals from different organizations, including PZIOC, LDG, MTC1, MICI, CE, MOC, MOR, MOL, TERA/HOR, TEPA, LDK, and ARAY/CEDE, indicating a broad interest from potential contractors or stakeholders in this government project.
Wage Determination - 17 Feb 26.pdf
PDF241 KBMay 8, 2026
AI Summary
The document outlines a federal grant or RFP process, focusing on technical specifications and compliance requirements. It details various project codes, including categories for general services, infrastructure, and specialized operations. Key sections address financial parameters, reporting structures, and contractual obligations, emphasizing adherence to federal guidelines. The file also includes a detailed breakdown of budgetary allocations and performance metrics, indicating a structured approach to project management and oversight. The recurring alphanumeric codes suggest a standardized system for tracking and managing proposals or grants, ensuring accountability and transparency in federal procurement or funding initiatives. Overall, the document serves as a comprehensive guide for potential applicants or contractors, specifying the administrative and technical prerequisites for engagement with the government program.

Related Contract Opportunities

Project Timeline

postedOriginal Solicitation PostedFeb 24, 2026
amendedAmendment #1· Description UpdatedApr 2, 2026
amendedAmendment #2· Description UpdatedApr 3, 2026
amendedAmendment #3· Description UpdatedMay 1, 2026
amendedLatest Amendment· Description UpdatedMay 8, 2026
deadlineResponse DeadlineMay 15, 2026
expiryArchive DateFeb 17, 2027

Agency Information

Department
DEPT OF DEFENSE
Sub-Tier
DEPT OF THE AIR FORCE
Office
FA8137 AFSC PZIOC

Point of Contact

Name
Isaac Demmers

Place of Performance

S Coffeyville, Oklahoma, UNITED STATES

Official Sources