Laughlin AFB - Bldg 308 Carpet Replacement
Contract Opportunity Analysis
The Department of the Air Force, specifically the FA3099 47 CONF CC at Laughlin Air Force Base in Texas, is seeking a contractor to install electrical outlets for Building 504. The selected contractor must provide all design, labor, tools, and materials to run 160 feet of overhead power lines on three new utility poles, complete hydro-trenching, and install six 480-volt weatherproof twist-lock receptacles with dedicated disconnect switches. Work must comply with NFPA 70 and UFC 1-200-01 standards, observe a 128-day period of performance, and accommodate a height limit of 28 feet for the new utility poles. Quotes must be submitted on company letterhead, remain valid until September 30, 2026, and will be evaluated on price, past performance, and technical approach to award a single firm-fixed-price purchase order.