ContractSolicitationService-Disabled Veteran-Owned Small Business Set Aside

4120--618-24-115 Replace Coil MAU #3 and #38

DEPARTMENT OF VETERANS AFFAIRS 36C26326B0002_0002
Response Deadline
Nov 17, 2025
Deadline passed
Days Remaining
0
Closed
Set-Aside
Service-Disabled Veteran-Owned Small Business Set Aside
Notice Type
Solicitation

Contract Opportunity Analysis

The Department of Veterans Affairs is soliciting bids for the replacement of Coil MAU #3 and #38 at the Minneapolis VA Medical Center. This project involves plumbing, heating, and air-conditioning work, specifically focusing on facility upgrades that require compliance with Infection Control Risk Assessment (ICRA) standards and Interim Life Safety Measures (ILSM) due to the healthcare environment. The contract is set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSBC) and includes specific requirements such as the use of temporary plastic wall panels for ICRA compliance and the need for premium pricing for off-hours work. Interested contractors can reach out to Contract Specialist Benjamin Woehrle at benjamin.woehrle@va.gov or call 651-293-3071 for further details. The solicitation includes additional documents that clarify project requirements and expectations, with a focus on ensuring safety and compliance throughout the execution of the work.

Classification Codes

NAICS Code
238220
Plumbing, Heating, and Air-Conditioning Contractors
PSC Code
4120
AIR CONDITIONING EQUIPMENT

Solicitation Documents

8 Files
Attach A- Question and Answers Round 2.pdf
PDF80 KBNov 6, 2025
AI Summary
This government file addresses various questions and clarifications regarding a project, likely an RFP, focusing on facility upgrades. Key points include confirmation that a prime contractor's superintendent can serve as a dual-hatted QA/QC manager and safety official, provided they meet training and experience requirements. The use of temporary plastic wall panels (STARC panels) is acceptable for ICRA requirements, with the project anticipated to require Level 2 ICRA. Shutdowns for AH-38 in the Main Hospital penthouse require premium off-hours pricing, while MAU #3 related work can be done during normal hours. There is no asbestos in the AHU-38 or MAU-3 work areas, and duct cleaning is not part of the scope. The document also provides model and serial numbers for AHU #38 and MAU #3, and confirms that tax should be included in proposals. Further details regarding access, piping diagrams, and a sign-in sheet are referenced in Addendum 1 and attached documents. The overall purpose is to clarify project requirements and answer contractor questions to ensure compliance and smooth execution.
Integral Face & Bypass Coil Detail.pdf
PDF49 KBNov 6, 2025
AI Summary
No AI summary available for this file.
Float & Thermostatic Steam Trap Detail.pdf
PDF56 KBNov 6, 2025
AI Summary
No AI summary available for this file.
MAU-3 Photo.pdf
PDF1326 KBNov 6, 2025
AI Summary
No AI summary available for this file.
AHU-38 Photo.pdf
PDF2594 KBNov 6, 2025
AI Summary
No AI summary available for this file.
ILSM - 618-24-115 Replace MAU Coils - Template.pdf
PDF180 KBNov 6, 2025
AI Summary
The Minneapolis VA Medical Center's Interim Life Safety Assessment outlines critical procedures for managing safety risks during construction or renovation projects. Dated February 26, 2025, the document addresses potential issues such as blocked exits, impaired fire systems, breeched smoke walls, and accumulation of debris. For each identified problem, specific requirements are detailed, including notifying the fire department, initiating fire watches, documenting alternative egress training, conducting daily inspections, and developing temporary fire alarm systems. The assessment also covers the use of smoke-tight partitions, proper debris removal, and training for other safety hazards. This guide emphasizes proactive planning and documentation to ensure life safety and compliance throughout project execution.
PCRA - 618-24-115 Replace MAU Coils - Template.pdf
PDF303 KBNov 6, 2025
AI Summary
The VHA Pre-Construction Risk Assessment (PCRA) template outlines minimum requirements for evaluating construction, renovation, and maintenance activities within VHA facilities. Its primary purpose is to categorize activity types and associated safety risks to implement appropriate precautions, safeguarding patients, employees, and contractors. The template emphasizes using the statement of work and drawings for assessment, integrating communication and coordination plans, and customizing the template for site-specific needs. It explicitly states that it addresses non-infection-related safety and must be used in conjunction with the VHA Infection Control Risk Assessment (ICRA) when required. The PCRA categorizes activities into three types—Inspection/Upkeep, Small-scale, and Large-scale—each with escalating control measures, and includes a section for assessing and coordinating with affected adjacent areas. A fillable permit form for posting at the activity site is provided, detailing the activity type and required control measures.
ICRA - 618-24-115 Replace MAU Coils - Template.pdf
PDF553 KBNov 6, 2025
AI Summary
The VHA Infection Control Risk Assessment (ICRA) for Construction, Renovation, and Maintenance (VHA-ICRA-2023-1.0) provides a standardized framework for healthcare facilities to minimize infection risks during construction activities. This template outlines minimum requirements for categorizing activity types (A, B, C, D) and patient risk levels (Low, Medium, High, Highest) to determine the necessary infection prevention and control precautions (Levels I, II, III, IV). It details a four-step process: identifying the activity category, assessing affected areas, determining overall patient risk, and establishing the appropriate precaution level. The document also specifies required control measures for each precaution level, both during and upon completion of the activity, including detailed cleaning, HVAC system management, and water system protocols. An infection prevention and control permit is mandatory for Level III and IV activities. This comprehensive guideline is crucial for ensuring patient and staff safety in healthcare environments during facility modifications.

Related Contract Opportunities

Project Timeline

postedOriginal Solicitation PostedNov 6, 2025
deadlineResponse DeadlineNov 17, 2025
expiryArchive DateDec 31, 2025

Agency Information

Department
DEPARTMENT OF VETERANS AFFAIRS
Sub-Tier
VETERANS AFFAIRS, DEPARTMENT OF
Office
NETWORK CONTRACT OFFICE 23 (36C263)

Point of Contact

Contract Specialist
Benjamin Woehrle

Place of Performance

Minneapolis, Minnesota, UNITED STATES

Official Sources