ContractSolicitation

SD FLAP SDGFP PARKING(1) North Point Parking Lot

DEPARTMENT OF TRANSPORTATION 6982AF26B000005
Response Deadline
May 19, 2026
Deadline passed
Days Remaining
0
Closed
Set-Aside
No Set aside used
Notice Type
Solicitation

Contract Opportunity Analysis

The Federal Highway Administration’s Central Federal Lands Highway Division is soliciting a construction contract to reconstruct the North Point Parking Lot at the North Point Recreation Area near Pickstown, South Dakota. The work covers removal of the existing asphalt and base, replacement with new aggregate base and asphalt pavement, subexcavation of poor soils, an ADA-compliant parking stall adjustment, a concrete dumpster pad, signing, and striping. The 98,000-square-foot boat-ramp parking area in Charles Mix County will be closed during construction, no organized site visit is planned, and the solicitation is being handled as full and open competition with a HUBZone price evaluation preference. Bids were opened on May 19, 2026, in Lakewood, Colorado, and submissions were required in printed sealed envelopes rather than electronically.

Classification Codes

NAICS Code
237310
Highway, Street, and Bridge Construction
PSC Code
Y1LB
CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS

Solicitation Documents

17 Files
QnA. 5.12.26.pdf
PDF150 KBMay 19, 2026
AI Summary
The document contains a series of questions and answers related to the SD FLAP SDGFP Parking(1) North Point Parking project, likely a federal or state RFP. It addresses various aspects of the project, including the absence of an organized site visit, how to access a bidders list via SAM.gov, and where to find information on field office requirements, power sources, material substitutions, personnel requirements, period of performance deviations, phasing, tax exemptions, project start times, inspection and permitting needs, soil boring reports, water sources for grading, landscaping restoration, staking data points, construction survey requirements, closure restrictions, and soil erosion control. Many answers direct bidders to specific sections of the FP-24, SCRs (Supplemental Contract Requirements), Plans, or relevant FAR (Federal Acquisition Regulation) clauses, emphasizing adherence to contract documents.
Bid Opening Summary- SD FLAP SDGFP Parking (1) North Point Parking Lot.pdf
PDF174 KBMay 19, 2026
AI Summary
The Bid Opening Summary for Project Number SD FLAP SDGFP Parking(1), also known as the North Point Parking Lot project, details the bids received on May 19, 2026, at 2:00 p.m. MST in Lakewood, CO. Ryan Phillips served as the Bid Opening Officer. One amendment was noted on December 9, 2025. Four bidders submitted proposals: Construction Solutions Group, LLC ($1,358,608.00), Yorkshire Industries, LLC ($1,506,776.10), Precision Grading, LLC ($1,000,853.26), and Jeremy Thomas Construction, LLC ($1,800,131.90). The Engineer’s Estimate for the project was $2,346,000.00. Precision Grading, LLC submitted the lowest bid, significantly below the engineer's estimate. All bids are subject to verification.
6982AF26B000005- IFB SD FLAP SDGFP Parking(1) North Point Parking Lot.pdf
PDF3676 KBMay 19, 2026
AI Summary
The U.S. Department of Transportation Federal Highway Administration, Central Federal Lands Highway Division, issued an Invitation for Bid (Solicitation Number: 6982AF26B000005) for the SD FLAP SDGFP PARKING (1) NORTH POINT PARKING LOT project in Charles Mix County, South Dakota. This project involves the reconstruction of a 98,000 square-foot parking lot servicing a boat ramp in the North Point Recreation Area, addressing deteriorated pavement and sub-base. The scope includes roadway excavation, aggregate base and paving, permanent signing, and pavement markings. The solicitation is a Full and Open Competition with a HUBZone Price Evaluation Preference and is estimated to be between $2,000,000 and $5,000,000. Bids are due by May 19, 2026, at 2:00 p.m. local time, and must be submitted in printed, sealed envelopes, with electronic bids not accepted. A bid guarantee of 20% of the bid price or $3,000,000 (whichever is less) is required. The project is governed by 48 CFR, Chapter 1, Federal Acquisition Regulation (FAR), Revolutionary FAR Overhaul (RFO), Department of Transportation Acquisition Regulation (TAR), and Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-24. Contractors must be registered in the System for Award Management (SAM) and comply with small business subcontracting goals, including specific percentages for various disadvantaged business concerns.
fp-24.pdf
PDF5880 KBMay 19, 2026
AI Summary
The “Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects” (FP-24) outlines the requirements for federal highway projects administered by the Federal Highway Administration. It integrates federal acquisition regulations (FAR) and transportation acquisition regulations (TAR) into its contractual framework. The FP-24 defines project terms, formats, and abbreviations, using U.S. Customary units with metric references for testing. The document details general and project-specific requirements, including construction guidelines for earthwork, retaining systems, aggregate and base courses, asphalt and rigid pavements, bridge construction, and incidental construction. It also specifies material requirements for all construction divisions. The FP-24 establishes authority for the Contracting Officer and inspectors, outlines electronic documentation standards, and details requirements for bids, awards, performance bonds, and quality control. Drawings and calculations, especially for structures, must bear a professional engineer's seal.
Horizontal Alignment.pdf
PDF75 KBMay 19, 2026
AI Summary
The "Horizontal Alignment Review Report," created on February 23, 2026, details the geometric characteristics of the "BL_900" alignment for the "Design IntlFt" project. This report, likely for a federal or state infrastructure RFP, outlines the alignment's horizontal geometry in feet, including linear and circular elements. It provides precise stationing, Northing and Easting coordinates, and detailed parameters for each segment. Key data points include tangential directions and lengths for linear sections, and for circular curves, it specifies radius, delta angle, degree of curvature, length, tangent, chord, and middle ordinate. The report methodically documents the progression of the alignment, detailing changes in direction and curvature across multiple segments, ensuring all geometric specifications are clearly presented for review and compliance.
QnA. 4.28.26.pdf
PDF72 KBMay 19, 2026
AI Summary
The document addresses questions and answers related to the "SD FLAP SDGFP Parking(1) North Point Parking" advertisement, specifically clarifying that no organized site visit will be held. This information is critical for potential bidders or applicants involved in federal or state/local RFPs, grants, or similar government procurement processes, as it sets expectations regarding site inspection opportunities for the project slated for April 28, 2026.
Horizontal Alignment.xml
XML14 KBMay 19, 2026
AI Summary
The "Horizontal Alignment Review Report," created on February 23, 2026, details the geometric characteristics of the "BL_900" alignment for the "Design IntlFt" project. This report, likely for a federal or state infrastructure RFP, outlines the alignment's horizontal geometry in feet, including linear and circular elements. It provides precise stationing, Northing and Easting coordinates, and detailed parameters for each segment. Key data points include tangential directions and lengths for linear sections, and for circular curves, it specifies radius, delta angle, degree of curvature, length, tangent, chord, and middle ordinate. The report methodically documents the progression of the alignment, detailing changes in direction and curvature across multiple segments, ensuring all geometric specifications are clearly presented for review and compliance.
SD FLAP SDGFP_calc wrksht-rdwy exc pay item.pdf
PDF64 KBMay 19, 2026
AI Summary
The document provides an Earthwork Summary detailing excavation and embankment volumes for a construction project. It specifies 5,173 cubic yards of total roadway prism excavation. Material available for fill from structure excavation, roadway obliteration, and subexcavation totals 0 cubic yards. Material unavailable for fill, including pavement removal and topsoil stripping, amounts to 2,103 cubic yards. After adjustments for shrink/swell, 3,070 cubic yards of excavation are available for fills. The total required fill material (embankment and backfill) is 0 cubic yards. This results in a surplus of 3,070 cubic yards, which is categorized as estimated total waste. The document indicates
QnA. 5.11.26.pdf
PDF210 KBMay 19, 2026
AI Summary
This government file, titled "Questions and Answers during Advertisement for SD FLAP SDGFP Parking(1) North Point Parking," addresses inquiries regarding a federal project. Key questions and their responses are provided. Specifically, the document clarifies that there will be no organized site visit for this project. Additionally, it directs vendors seeking a bidders list to the Interested Vendors tab on SAM.gov, emphasizing that a separate list is not maintained. It also advises users to ensure they are signed in and their account is linked to their entity registration for access, providing contact information for the Federal Service Desk for further assistance. The document is an informational resource for potential bidders on this federal parking project.
SDGFP Existing Surface.xml
XML186 KBMay 19, 2026
AI Summary
The document "SDGFP Existing" is a LandXML file, version 1.2, created on February 23, 2026, at 8:07:15 PM. It details existing topographical data for a project named "SDGFP Existing." The file specifies imperial units for measurements, including square feet for area, feet for linear distances, cubic yards for volume, Fahrenheit for temperature, and inches of mercury for pressure. The data was generated using "OpenRoads Designer" version 10.10.21.04 by Bentley Systems, Inc. The core of the file contains surface information, specifically for a "Bottom Mesh," which includes a list of 3D data points (PntList3D) described as "RandomPoints" and an "outer" boundary named "TEB3." This boundary defines the extent of the surveyed area, with numerous 3D coordinates. The definition of the surface uses a Triangulated Irregular Network (TIN) model, listing individual 3D points (P) with unique IDs. This file is a technical data record, likely for civil engineering or land surveying purposes, detailing existing ground conditions.
SDGFP Top of Agg.xml
XML94 KBMay 19, 2026
AI Summary
The LandXML file details a surface named "Design_Contours_Bottom Mesh" for a project called "SDGFP Top of Agg." The file, created by Bentley Systems' OpenRoads Designer, uses Imperial units (squareFoot, foot, cubicYard, fahrenheit, inHG). It contains extensive 3D point data (PntList3D) defining the terrain, along with boundary information for an outer edge trim boundary named "Slope_Stake_1:4_R." The numerous coordinate entries indicate a detailed topographical or design surface, likely for a civil engineering or construction project, providing precise elevation and location data.
Vertical Alignment.pdf
PDF111 KBMay 19, 2026
AI Summary
The "Vertical Alignment Review Report," created on March 25, 2026, for the "Design IntlFt" project, details the vertical alignment of the BL_900 horizontal alignment. The report provides a comprehensive list of linear elements, each defined by a series of Vertical Point of Intersection (VPI) stations and elevations. For each linear segment between VPIs, the report specifies the tangent grade and tangent length in feet. The data spans a significant range of stations, from 89800.000 to 91052.533, and includes corresponding elevations, with grades varying between positive and negative values. This detailed alignment information is crucial for design, construction, and review processes within the project, ensuring precise adherence to the specified vertical profile.
Amendment A001-SD FLAP SDGFP Parking (1) North Point.pdf
PDF329 KBMay 19, 2026
AI Summary
This document is an amendment to a solicitation/modification of a contract, specifically Amendment A001 dated May 12, 2026, issued by the Federal Highway Administration, Central Federal Lands Highway Division. It outlines the methods for offerors to acknowledge receipt of amendments, emphasizing that failure to do so by the specified deadline may result in the rejection of their offer. The amendment primarily focuses on updating the 'IFB Section C- Contract Clauses' by replacing pages C-5 and C-15 with attached amended versions. These updated pages include various FAR clauses related to contract termination, wage rate requirements, labor standards, equal opportunity, affirmative action for workers with disabilities, employment reports on veterans, employee rights, combating trafficking in persons, employment eligibility verification, paid sick leave, addressing DEI discrimination, reporting of biobased products, cleaning up, accident prevention, schedules for construction contracts, layout of work, specifications and drawings for construction, security prohibitions and exclusions, payments to small business subcontractors, bankruptcy, suspension of work, changes, change order accounting, subcontracts for commercial products and commercial services, government property, inspection of construction, preference for privately owned U.S.-flag commercial vessels, value engineering - construction, termination for convenience of the government, default (fixed-price construction), and clauses incorporated by reference.
Vertical Alignment.xml
XML1 KBMay 19, 2026
AI Summary
The "Vertical Alignment Review Report," created on March 25, 2026, for the "Design IntlFt" project, details the vertical alignment of the BL_900 horizontal alignment. The report provides a comprehensive list of linear elements, each defined by a series of Vertical Point of Intersection (VPI) stations and elevations. For each linear segment between VPIs, the report specifies the tangent grade and tangent length in feet. The data spans a significant range of stations, from 89800.000 to 91052.533, and includes corresponding elevations, with grades varying between positive and negative values. This detailed alignment information is crucial for design, construction, and review processes within the project, ensuring precise adherence to the specified vertical profile.
23.100 Floodplain Development Memo.pdf
PDF38089 KBMay 19, 2026
AI Summary
The North Point Boat Ramp Parking Lot project, part of the SD FLAP SDGFP North Point – RTE 900, involves replacing existing pavement within a FEMA-regulated Special Flood Hazard Area (SFHA), Zone A, in Charles Mix County, South Dakota. HDR's Amy Finseth contacted Michael Kotab, the Charles Mix County Floodplain Administrator, who confirmed that no Floodplain Development Permit is required. This determination is based on the project primarily being a replacement of existing pavement with no significant fill added, ensuring no impact on base flood elevations. The project includes replacing asphalt and aggregate, adding one ADA parking space, extending pavement through existing grass median areas, and installing new signs and pavement markings. The reconstruction is designed to maintain existing ground elevations and complies with Federal Lands Highway PDDM and 44 CFR 60.3 criteria for approximate FEMA Zone A – Special Flood Hazard Areas.
SD FLAP SDGFP AD Pavement Report.pdf
PDF16270 KBMay 19, 2026
AI Summary
Shannon & Wilson conducted a pavement design report for the reconstruction of the boat ramp parking lot at North Point Recreation Area in Charles Mix County, South Dakota. The project, under the Federal Highway Administration, Central Federal Lands Highway Division, on behalf of South Dakota Game, Fish & Parks, addresses distressed asphalt concrete pavement and chip seal. Subsurface explorations, laboratory testing, and visual assessments revealed medium stiff to stiff lean to fat clay subgrade soils. The report recommends pavement section alternatives, including full-depth ACP, composite ACP over crushed aggregate base (CAB), full depth reclamation (FDR), and ACP over lime-treated subgrade (LTS). The preferred alternative is 3.5 inches of ACP over 6 inches of CAB with a geotextile separator. Additional considerations include mitigation for expansive soils, frost damage, and corrosive soil. Construction considerations emphasize proper subgrade preparation, compaction, and managing soft subgrade conditions. The report details material specifications and limitations.
SD FLAP SDGFP AD Plans.pdf
PDF42623 KBMay 19, 2026
AI Summary
The document provides comprehensive plans for the North Point Parking Lot project (SD FLAP SDGFP PARKING(1)), focusing on roadway construction, pavement replacement, and site improvements. It includes detailed abbreviations, conventional plan symbols, survey control information, and a site map. Key sections outline typical pavement sections, including asphalt concrete pavement and roadway aggregate. The project covers a length of 840.9 feet (0.16 miles) and specifies quantities for various pay items, such as roadway excavation, asphalt concrete, and pavement markings. The plan incorporates specific details for drainage, fencing, landscaping, mapping, right-of-way, guardrail, signs, and utilities. Special provisions include stabilization geotextile (Option X), concrete pads, sign structures, and pavement marking symbols. Traffic control plans are also outlined to ensure safety during construction.

Related Contract Opportunities

Project Timeline

postedOriginal Solicitation PostedApr 17, 2026
amendedAmendment #1Apr 28, 2026
amendedAmendment #2May 11, 2026
amendedAmendment #3May 13, 2026
amendedAmendment #4May 15, 2026
amendedLatest AmendmentMay 19, 2026
deadlineResponse DeadlineMay 19, 2026
expiryArchive DateJun 19, 2026

Agency Information

Department
DEPARTMENT OF TRANSPORTATION
Sub-Tier
FEDERAL HIGHWAY ADMINISTRATION
Office
6982AF CENTRAL FEDERAL LANDS DIVISI

Point of Contact

Name
Stephanie Navarro

Place of Performance

Pickstown, South Dakota, UNITED STATES

Official Sources