ContractSources Sought

RFI - UMTE X Band Transmitter

DEPT OF DEFENSE FA8210-26-RFI-UMTE
Response Deadline
Jul 18, 2026
60 days left
Days Remaining
60
Until deadline
Set-Aside
No Set aside used
Notice Type
Sources Sought

Contract Opportunity Analysis

The Air Force Life Cycle Management Center at Hill Air Force Base is conducting market research for an Unmanned Threat Emitter X-band transmitter to identify industry sources that can consolidate and replace obsolete legacy transmitter systems. The effort seeks commercial off-the-shelf, modified commercial off-the-shelf, or developmental solutions that can combine the functions of the current TK-1, TK-2, and TK-4 ground-based threat emitter platforms into a more modern and supportable architecture. Key technical needs include operation from 6.5 GHz to 15.5 GHz, 250 W power amplifier output, and an 85 dBm effective radiated power threshold, and the drawings are controlled unclassified information requiring approval for access to unclassified military technical data. Responses are due by July 18, 2026, and the primary contact listed is Heather Ball at heather.ball@us.af.mil or 801-777-9438.

Classification Codes

NAICS Code
334511
Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing
PSC Code
5840
RADAR EQUIPMENT, EXCEPT AIRBORNE

Solicitation Documents

1 Files
UTME X Band Transmitter RFI.pdf
PDF274 KBMay 19, 2026
AI Summary
The Air Force Life Cycle Management Center (AFLCMC) is conducting market research through a Request For Information (RFI) for an Unmanned Threat Emitter (UMTE) X-Band Transmitter. The RFI seeks industry solutions to consolidate and replace obsolete, single-function transmitter systems (TK-1, TK-2, TK-4) currently facing diminishing manufacturing sources, increasing sustainment costs, and excessive Size, Weight, Power, and Cooling (SWaP-C) footprints. The objective is to identify commercial off-the-shelf (COTS), modified COTS, or developmental technologies that can combine the functionalities of these legacy systems into a single, modernized, and supportable framework. Key requirements include an operating frequency of 6.5 GHz to 15.5 GHz, Power Amplifier (PA) Power Out of 250 W, and an Effective Radiated Power (ERP) threshold of 85 dBm. Vendors are asked to provide white papers addressing technical approach, SWaP-C impact, interoperability, Technology Readiness Level (TRL), sustainment, and Rough Order of Magnitude (ROM) cost and schedule estimates. Responses are due by July 18, 2026.

Related Contract Opportunities

Project Timeline

postedOriginal Solicitation PostedMay 19, 2026
deadlineResponse DeadlineJul 18, 2026
expiryArchive DateAug 2, 2026

Agency Information

Department
DEPT OF DEFENSE
Sub-Tier
DEPT OF THE AIR FORCE
Office
FA8210 AFLCMC WNRK HILL

Point of Contact

Name
Heather Ball

Place of Performance

Hill Air Force Base, Utah, UNITED STATES

Official Sources