ContractCombined Synopsis/SolicitationTotal Small Business Set-Aside (FAR 19.5)

Headspace Gages

DEPT OF DEFENSE N6426725Q4156
Response Deadline
Jun 26, 2025
Deadline passed
Days Remaining
0
Closed
Set-Aside
Total Small Business Set-Aside (FAR 19.5)
Notice Type
Combined Synopsis/Solicitation

Contract Opportunity Analysis

The Department of Defense, through the Naval Surface Warfare Center, is seeking quotations for the procurement of two MK22 Headspace Gauge kits, which are critical for military applications. This solicitation is a total small business set-aside and requires that all proposals conform to the specifications outlined in the combined synopsis/solicitation, including firm fixed pricing and delivery timelines of approximately 12 weeks post-award. The amendment to the solicitation has extended the response deadline to June 25, 2025, at 5:00 PM, and emphasizes the importance of acknowledging this change to avoid rejection of offers. Interested contractors must submit their quotations electronically and are encouraged to contact Colin Dwyer at colin.dwyer.civ@us.navy.mil for further inquiries.

Classification Codes

NAICS Code
332710
Machine Shops
PSC Code
3470
MACHINE SHOP SETS, KITS, AND OUTFITS

Solicitation Documents

3 Files
12. Draft RFQ.pdf
PDF1163 KBMay 8, 2025
AI Summary
The Naval Surface Warfare Center (NSWC), Corona Division, is requesting procurement of two MK22 Headspace Gages kits. The requirement includes specific gages for various calibers, with a total of 16 individual gages across several types, such as 7.62mm NATO, .300NORMA, .338NORMA, and .300 Winchester Magnum, alongside associated equipment like a Pelican case. Vendors must operate within a 30-mile radius of NSWC Corona for inspection purposes prior to delivery. The kits must adhere strictly to the attached specifications and drawings. The completion timeframe set for delivery is 12 weeks post-contract award, with deployment information going to the NSWC's location in Norco, California. Once delivered, an inspection and acceptance process will be conducted to ensure compliance with standards. The document serves as a detailed request for proposal (RFP) aimed at establishing the supply chain for accurate military gaging equipment, critical for weapon system testing and safety operations.
13. RFQ.pdf
PDF673 KBJun 24, 2025
AI Summary
The Naval Surface Warfare Center Corona Division has issued a Request for Quotations (RFQ) for the procurement of two MK22 Headspace Gauge kits required for military applications. This RFQ is not an order but a request for information, outlining that submissions do not commit the government to any costs. The document specifies various items needed, including headspace gages for different calibers and firing pins, emphasizing firm fixed pricing for each. Each item is set to be delivered to a specified government location, with delivery due approximately 12 weeks after contract award. The RFQ includes comprehensive instructions on the packaging, labeling, and delivery of supplies, alongside clauses regarding inspection and acceptance of delivered items. It highlights the contractor's responsibilities in ensuring compliance with federal laws and regulations and details inspection protocols to be conducted by government representatives. Overall, the document serves as an essential guideline for potential suppliers, defining the procurement process while ensuring that all submissions meet the required specifications for government contracts.
14. Amendment.pdf
PDF367 KBJun 24, 2025
AI Summary
The document outlines an amendment to a solicitation for a contract with the Naval Surface Warfare Center Corona Division. The primary purpose is to incorporate additional documentation, specifically a drawing related to the MK22 firing pin protrusion, and to extend the solicitation's response deadline to June 25, 2025, at 5:00 PM. Specific sections of the contract were updated, including the attachment of several drawings relevant to the contract: the MK13 gauge headspace, MK22 gauge kit, and others. The amendment emphasizes the importance of acknowledging this change for all responding contractors, as failure to do so could lead to offer rejection. This formal amendment process reflects typical procedures in government procurement, ensuring that all parties are informed of updates that might affect their submissions for federal contracts. Overall, the document serves to clarify the updated requirements and timelines essential for ongoing contract negotiations with interested contractors.

Related Contract Opportunities

Project Timeline

postedOriginal Solicitation PostedMay 8, 2025
amendedLatest AmendmentJun 24, 2025
deadlineResponse DeadlineJun 26, 2025
expiryArchive DateJul 10, 2025

Agency Information

Department
DEPT OF DEFENSE
Sub-Tier
DEPT OF THE NAVY
Office
NAVAL SURFACE WARFARE CENTER

Point of Contact

Name
Colin Dwyer

Place of Performance

Norco, California, UNITED STATES

Official Sources