ContractCombined Synopsis/SolicitationTotal Small Business Set-Aside (FAR 19.5)

Northern Hills Ranger District Parking Lot Reconstruction, Spearfish, South Dakota

DEPARTMENT OF AGRICULTURE 1240LT26Q0053
Response Deadline
Jun 4, 2026
15 days left
Days Remaining
15
Until deadline
Set-Aside
Total Small Business Set-Aside (FAR 19.5)
Notice Type
Combined Synopsis/Solicitation

Contract Opportunity Analysis

The USDA Forest Service’s Northern Hills Ranger District is seeking a contractor to reconstruct the parking lot at its Spearfish, South Dakota site to address structural, grading, and drainage problems. The work includes removing and replacing existing paving and site elements, regrading the area, installing proper base materials and new asphalt and concrete pavement, and adding sidewalks, accessible parking, fencing, gates, drainage improvements, and site lighting. The project is driven by poor existing sub-base conditions, clay-rich soils, frost-related damage, and recommended earthwork and pavement design considerations, with the work planned for the Spearfish location and a period of performance running from June 15, 2026, through December 11, 2026. Quotes are due June 4, 2026, at 10:00 MDT, a site visit is scheduled for May 6, 2026, at 1:00 PM MST, and offerors must acknowledge all amendments; the DWG files referenced in Amendment 0004 must be requested directly from Holly Hlavac at Holly.Hlavac@usda.gov.

Classification Codes

NAICS Code
237310
Highway, Street, and Bridge Construction
PSC Code
Y1LZ
CONSTRUCTION OF PARKING FACILITIES

Solicitation Documents

11 Files
1240LT26Q0053_A0002.pdf
PDF111 KBMay 19, 2026
AI Summary
Amendment 0002 to solicitation 1240LT26Q0053 extends the deadline for quotes for the Northern Hills Ranger District Parking Lot Reconstruction project from May 26, 2026, to June 4, 2026. Additionally, the period of performance start date is extended from June 8, 2026, to June 15, 2026, with an end date of December 11, 2026. The amendment, issued by USDA-FS CSA Intermountain, provides contact information for Contract Specialist Holly Hlavac. All other terms and conditions of the original solicitation remain unchanged. This modification aims to provide additional time for offerors to submit their proposals and adjust the project timeline.
1240LT26Q0053_A0004.pdf
PDF154 KBMay 19, 2026
AI Summary
Amendment 0004 to solicitation 1240LT26Q0053 addresses the "Northern Hills Ranger District Parking Lot Reconstruction, Spearfish, South Dakota" project. The amendment primarily corrects an error in Amendment 0003, which stated that DWG files (C050, C100, C200, C202, C300, C302, C303, and C304) would be provided as attachments. Due to SAM.gov's inability to accept this file type, contractors must now request these specific DWG files directly from the listed point of contact, Contract Specialist Holly Hlavac at Holly.Hlavac@usda.gov. All other terms and conditions of the original solicitation and previous amendments remain unchanged. This amendment emphasizes the importance of acknowledging receipt of all amendments prior to the offer submission deadline to avoid rejection of bids.
1240LT26Q0053_A0003.pdf
PDF1119 KBMay 19, 2026
AI Summary
Amendment 0003 for solicitation 1240LT26Q0053 addresses the Northern Hills Ranger District Parking Lot Reconstruction project in Spearfish, South Dakota. This amendment incorporates consolidated questions and answers from contractors, including a redacted site visit sign-in sheet. Key attachments include a revised Geotechnical Report (M2215045) and updated DWG files (C050, C100, C200, C202, C300, C302, C303, C304). The amendment clarifies various project specifics, such as the removal and replacement of the chain-link fence, concrete drain, and lighting, while the front parking lot will be sealed and restriped. It specifies that parking lot lights must be hardwired, though solar lights may be considered as a value engineering proposal. The document also addresses contractor staffing requirements, past performance submission guidelines, and confirms no asbestos on site. The anticipated start date for on-site work is July 2026, with the project needing completion before winter.
M2215045 - USFS Northern Hills Office Geotechnical-Revised.pdf
PDF1533 KBMay 19, 2026
AI Summary
Terracon Consultants, Inc. prepared a Geotechnical Engineering Report for the USFS Northern Hills Office in Spearfish, South Dakota, dated September 9, 2021. The report details subsurface exploration and geotechnical recommendations for the proposed parking lot reconstruction at 2014 N Main Street. Key aspects include subsurface soil conditions, site preparation, earthwork, groundwater, and pavement design. The project involves reconstructing the existing parking lot, with anticipated cuts and fills of 2 to 3 feet. The report provides recommendations for rigid (concrete) and flexible (asphalt) pavement sections, considering a 20-year design period. Subsurface characterization identified layers of asphalt, aggregate base, fill (sandy lean clay), and various clays. Undocumented fill was found in one boring. The report highlights the potential for volume change and frost action in the clay soils and provides detailed earthwork, seismic, and pavement design recommendations, including material types, compaction requirements, and drainage considerations. Construction observation and testing are also recommended.
Attachment 3 - Drawings Signed 100 percent N Hills Ranger Parking Lot.pdf
PDF6778 KBMay 19, 2026
AI Summary
The document outlines the "Northern Hills Parking Lot Improvements" project for the United States Department of Agriculture, Forest Service. It includes construction documents, general notes, accessible routes, erosion control measures, grading plans, and site horizontal control notes. The project involves demolition of existing asphalt pavement, ramps, wheel stops, fences, and a light pole, along with the relocation of skid-mounted sheds and a dumpster. New construction includes concrete paving, curbs and gutters, ADA-compliant parking stalls, new fencing, pedestrian and vehicle gates, and a new dumpster location. The plans emphasize adherence to project specifications, utility protection, site restoration, and compliance with accessibility standards (ABAAS). Geotechnical investigations by Terracon Consultants, Inc. informed the design, and a routine maintenance program is required to maintain proper grading and drainage. The document details existing conditions, proposed changes, and a comprehensive list of civil sheets covering legends, notes, plans for demolition, erosion control, site and paving, grading, and various construction details.
Attachment 1 - Statement of Work _3.27.2026.pdf
PDF162 KBMay 19, 2026
AI Summary
The US Department of Agriculture (USDA) Forest Service is seeking a contractor for the Northern Hills Ranger District Parking Lot Reconstruction project. This project addresses severe structural, grade, and drainage issues in the existing parking lot, which suffers from poor construction, inadequate sub-base, and extensive cracking due to clay-rich soil and freeze/thaw cycles. The scope of work includes removing existing fencing, lighting, and surfacing; regrading the site; and installing new base materials, concrete and asphalt paving, fencing, lighting, sidewalks, and improved accessible parking. Contractors must demonstrate a strong understanding of project requirements, communication skills, and experience in general contracting, road, and campground construction. Key deliverables include an Accident Prevention Plan, various submittals, a construction schedule, and an Operation and Maintenance Manual. Travel to the South Dakota site is required, with all costs included in the contractor's quote. The contractor must also provide an onsite superintendent, ensure public safety with suitable barriers, and acknowledge that all generated data and documentation will become government property. All electronic deliverables must be Section 508 compliant.
Attachment 2 - Schedule of Items 4.8.2026.xlsx
Excel14 KBMay 19, 2026
AI Summary
The document outlines a schedule of items for the "BLACK HILLS NATIONAL FOREST NORTHERN HILLS RANGER DISTRICT PARKING LOT REPLAC" project. It details various construction and demolition tasks required for the parking lot replacement. The schedule includes line items for mobilization, earth moving, imported material, excess material, base work, asphalt paving, concrete paving, site improvements, and demolition. Each item specifies the method of measurement (e.g., Lump Sum, Cubic Yards, Square Feet) and quantity. The document emphasizes that individual line-item pricing should be rounded up to the nearest whole dollar, excluding cents, and the total pricing should align with these individual amounts. This file serves as a component of a federal government RFP, outlining the scope of work for vendors bidding on the project.
1240LT26Q0053_A0001.pdf
PDF98 KBMay 19, 2026
AI Summary
Amendment 0001 to Solicitation No. 1240LT26Q0053, issued by USDA-FS CSA INTERMOUNTAIN 8, pertains to the "Northern Hills Ranger District Parking Lot Reconstruction, Spearfish, South Dakota" project. The amendment, effective April 21, 2026, primarily incorporates the mandatory FAR Clause 52.222-90, "Addressing DEI Discrimination by Federal Contractors (APR 2026)," as required by Executive Order 14398. This amendment updates the solicitation, and all other terms and conditions remain unchanged. Offerors must acknowledge receipt of this amendment to ensure their offers are considered. The point of contact for this amendment is Contract Specialist Holly Hlavac.
Combined Synopsis_1240LT26Q0053.pdf
PDF8911 KBMay 19, 2026
AI Summary
The USDA-FS CSA Intermountain 8 has issued Solicitation No. 1240LT26Q0053 for the Northern Hills Ranger District Parking Lot Reconstruction project in Spearfish, South Dakota. This Request for Proposal (RFP) is for construction, alteration, or repair, with a project magnitude estimated between $1,000,000 and $5,000,000. Key dates include a site visit on May 6, 2026, questions due by May 13, 2026, and quotes due by May 26, 2026, both at 10:00 MDT. A bid bond/offer guarantee of 20% of the total offer price (not exceeding $3 million) is required. The period of performance is from June 8, 2026, to December 11, 2026, encompassing tasks such as mobilization, earth moving, asphalt and concrete paving, and site improvements. All submissions and inquiries must be directed to Contract Specialist Holly Hlavac at Holly.Hlavac@usda.gov.
Attachment 4 - Specifications 4.8.2026.pdf
PDF14032 KBMay 19, 2026
AI Summary
The United States Department of Agriculture, Forest Service, Black Hills National Forest, Northern Hills Ranger District, issued a Request for Proposal (RFP) on January 14, 2021, for the Northern Hills Parking Lot Replacement project. This RFP outlines the specifications and construction documents, including a comprehensive list of civil and electrical drawings and various contract specifications across multiple divisions. The project encompasses earthwork, exterior improvements like asphalt and concrete paving, chain link fences, and exterior LED lighting. Key general requirements include contractor responsibilities for labor, materials, equipment, and utilities; adherence to site conditions and work restrictions; and strict safety protocols with a mandatory accident prevention plan. The document also details submittal procedures for action and informational items, construction schedules, temporary facilities and controls, execution requirements, operation and maintenance manuals, and closeout procedures. The project's payment structure defines lump sum, actual quantities, and designed quantities for various contract items, including mobilization, earth moving, imported material, asphalt and concrete paving, site improvements, and demolition. Quality assurance and control are emphasized through detailed plans, testing, and inspection requirements.
Attachment 5 - DBA Wage Determination Lawrence County.pdf
PDF2000 KBMay 19, 2026
AI Summary
This document, General Decision Number SD20260001, issued on January 30, 2026, outlines prevailing wage rates and fringe benefits for heavy and highway construction projects across South Dakota. It details classifications and corresponding wages for various trades, including Electricians, Ironworkers, Laborers, Painters, Power Equipment Operators, and Truck Drivers. The document categorizes workers within each trade into groups based on their specific tasks and equipment operation. It also includes important notes regarding Executive Order (EO) 13706 on paid sick leave for federal contractors and EO 13658 on minimum wage for federal contractors, providing links for additional information. Furthermore, the document explains different wage rate identifiers (Union Rate, Union Average Rate, Survey Rate, State Adopted Rate) and outlines the appeals process for wage determinations, including contacts for initial decisions and subsequent reviews by the Wage and Hour Administrator and the Administrative Review Board.

Related Contract Opportunities

Project Timeline

postedOriginal Solicitation PostedApr 21, 2026
amendedAmendment #1· Description UpdatedApr 22, 2026
amendedAmendment #2· Description UpdatedMay 14, 2026
amendedAmendment #3· Description UpdatedMay 18, 2026
amendedLatest Amendment· Description UpdatedMay 19, 2026
deadlineResponse DeadlineJun 4, 2026
expiryArchive DateJun 19, 2026

Agency Information

Department
DEPARTMENT OF AGRICULTURE
Sub-Tier
FOREST SERVICE
Office
USDA-FS, CSA INTERMOUNTAIN 8

Point of Contact

Name
Holly Hlavac

Place of Performance

Spearfish, South Dakota, UNITED STATES

Official Sources