ContractSources Sought

Replacement of Siding Buildings A, B, C, D, E, F & G at the New Hampshire JCC

DEPARTMENT OF LABOR 1605AE-26-N-00004
Response Deadline
May 4, 2026
7 days left
Days Remaining
7
Until deadline
Set-Aside
Full & Open
Notice Type
Sources Sought

Contract Opportunity Analysis

The U.S. Department of Labor, through the Office of Job Corps Acquisition Services, is seeking market information for a construction requirement to replace the siding on Buildings A through G at the New Hampshire Job Corps Center in Manchester, New Hampshire. The work covers phased removal of the existing wood siding and installation of a new fiber cement plank siding system, along with surface preparation, underlayment wrap, finishing work, and related architectural, electrical, and incidental mechanical tasks. The center will remain operational during construction, and the contractor must comply with applicable federal, state, and local building codes as well as EPA, OSHA, and NFPA-101 requirements; the project is identified as Project 4310 and the performance period is 435 days. This is a sources sought notice with no solicitation at this time, responses are limited to 5 pages, and statements of qualifications are due by May 4, 2026 at 2:00 PM EDT by email to Eileen Garnett and Paul M. Seivert.

Classification Codes

NAICS Code
238170
Siding Contractors
PSC Code
Z1CA
MAINTENANCE OF SCHOOLS

Solicitation Documents

1 Files
03 - Approved SOW.pdf
PDF1049 KBApr 20, 2026
AI Summary
The U.S. Department of Labor is seeking a contractor for the New Hampshire Job Corps Center in Manchester, New Hampshire, to replace all existing exterior wood siding with fiber cement siding on seven buildings (A, B, C, D, E, F, G). The project, identified as Project 4310, requires adherence to federal and state building codes, OSHA, NFPA-101, and EPA regulations. The center will remain operational during construction, necessitating a detailed work plan to minimize disruption. The project is phased by building, with specific architectural, electrical, and incidental mechanical work outlined. The contractor is responsible for permits, site safety, material storage, waste disposal, and reinstallation of all exterior fixtures and devices. The total performance period is 435 days.

Related Contract Opportunities

Project Timeline

postedOriginal Solicitation PostedApr 20, 2026
deadlineResponse DeadlineMay 4, 2026
expiryArchive DateMay 19, 2026

Agency Information

Department
DEPARTMENT OF LABOR
Sub-Tier
OFFICE OF THE ASSISTANT SECRETARY FOR ADMINISTRATION AND MANAGEMENT
Office
DOL - JCAS - AEC

Point of Contact

Name
Paul M. Seivert

Place of Performance

Manchester, New Hampshire, UNITED STATES

Official Sources