30 Day noise and vibration monitoring campaign at Stennis Space Center (SSC).
Contract Opportunity Analysis
The National Aeronautics and Space Administration Shared Services Center intends to award a contract for a 30-day noise and vibration monitoring campaign at the Stennis Space Center in Mississippi. The selected contractor must design, install, monitor, and remove a network of 73 systems, consisting of 38 sound level monitoring stations and 35 triaxial vibration stations across 16 specified buildings and the Enterprise Park site. Key deliverables include continuous measurements, site-wide mapping, and a final technical report correlating findings with engine test logs, with strict Technical Performance Measures requiring a minimum 95 percent data availability and at least 90 percent telemetry uptime. Although NASA intends to award this contract on a sole-source basis to HGC Noise Vibration Acoustics, Inc., interested organizations may submit their capabilities and qualifications to Lindsey McLellan at lindsey.m.mclellan@nasa.gov by 12:00 p.m. CST on August 12, 2026.