ContractSolicitation

Repair Intersection Runway 03-21 & 15-33

DEPT OF DEFENSE FA441826R0012
Response Deadline
Jun 15, 2026
26 days left
Days Remaining
26
Until deadline
Set-Aside
No Set aside used
Notice Type
Solicitation

Contract Opportunity Analysis

The Department of the Air Force, through FA4418 628 CONS PK at Joint Base Charleston/Charleston AFB, is soliciting a construction contract to repair the intersection of Runways 03-21 and 15-33. The work centers on removing and replacing 136 pavement panels and completing related airfield work such as asphalt shoulder milling and overlay, lighting installation, runway markings, pavement grinding, and pavement grooving. The project requires nightly work from Thursday through Monday between 2300 and 0700, use of specialized equipment and fast-setting concrete so the runway can reopen each morning, and the ability to perform work on a secure flight line; the period of performance is 636 calendar days after notice to proceed. Offers are due June 15, 2026 at 12:00 PM EST, and contractor questions are due by June 3, 2026 at 12:00 EST.

Classification Codes

NAICS Code
237310
Highway, Street, and Bridge Construction
PSC Code
Y1BD
CONSTRUCTION OF AIRPORT RUNWAYS AND TAXIWAYS

Solicitation Documents

13 Files
Solicitation Amendment FA441826R00120003 SF 30.pdf
PDF380 KBMay 20, 2026
AI Summary
Amendment 0003 to Solicitation Number FA441826R0012, effective May 11, 2026, extends the deadline for contractors to submit questions until June 3, 2026, at 12:00 EST. This amendment, issued by FA4418 628 CONS LGC, Charleston AFB, SC, modifies the original solicitation dated May 7, 2026. All other terms and conditions of the solicitation remain unchanged and in full force and effect. Contractors must acknowledge receipt of this amendment to ensure their offers are considered.
Solicitation Amendment FA441826R00120002 SF 30.pdf
PDF380 KBMay 20, 2026
AI Summary
Amendment 0002 to Solicitation FA441826R0012, effective May 11, 2026, was issued by FA4418 628 CONS LGC at Charleston AFB, SC. This amendment's primary purpose is to incorporate the Site Visit Sign-in sheet into the solicitation. It extends the offer receipt deadline, requiring offerors to acknowledge the amendment via completion of items 8 and 15, on each offer copy, or through separate communication. Failure to acknowledge the amendment by the specified time may lead to the rejection of the offer. All other terms and conditions of the original solicitation remain unchanged and in full effect.
Site Visit sign in sheet.pdf
PDF272 KBMay 20, 2026
AI Summary
The document lists key personnel and companies involved in a site visit for the "Repair Intersection Runway 03-21 & 15-33" project. It identifies government contacts, including Contracting Officers (CO) Robert Melton and Brian Hawk, and Project Manager (PM) Therese Dufficy from 628 CONS and 628 CES respectively. Travis Ellis from 628 CES is also listed. Inspector Gres Jones from ADC and Andrew Fender from Atlantic Electric (Electrical Sub) are included. Prime contractors involved are Ales Fraser from Kiewit, MARC Mitchell from Southern COD., ADAM SCOTT from ZACHRY Constraty, and Bill Gale from RC Construction. The document provides names, affiliations, phone numbers, and email addresses, indicating a collaborative effort for this runway repair project.
Solicitation Amendment FA441826R00120001 SF 30.pdf
PDF387 KBMay 20, 2026
AI Summary
Amendment 0001 to Solicitation FA441826R0012, effective May 11, 2026, modifies the original solicitation dated May 7, 2026. This amendment primarily aims to add a Joint Base Charleston (JB CHS) Question and Answer Form and post an updated Specification, specifically removing Section 3.11 from Section 01 45 00, pages 10-13. Additionally, it provides critical instructions for site visit attendees, requiring them to submit their full name, date of birth, state ID/driver's license number, and social security number to brian.hawk@us.af.mil by noon on May 12, 2026, to gain base access. Failure to provide this information will result in denied entry for the site visit. All other terms and conditions of the original solicitation remain unchanged. This amendment is issued by FA4418 628 CONS LGC, with Robert R. Melton as the Contracting Officer.
JB Charleston - Question and Answer Form.xlsx
Excel23 KBMay 20, 2026
AI Summary
The JB Charleston Offeror Question and Answer Form, associated with Solicitation Number FA441826R0012 for the "Repair Intersection Runway 03-21 / 15-33" project, outlines the protocol for offerors seeking clarification on the solicitation, drawings, or specifications. It mandates that any requests for explanation or interpretation must be submitted in writing sufficiently in advance to ensure all offerors receive a reply before proposal submission. The document explicitly states that oral explanations or instructions are not binding. Answers to offeror questions deemed necessary for proposal preparation or to prevent prejudice to other offerors will be posted on sam.gov. The form also provides structured fields for referencing specific sections of specifications, drawings, solicitations, or other attachments when posing questions, ensuring clear communication regarding the project requirements.
02 - SPEC PKG.2026 0414.FINAL.pdf
PDF5733 KBMay 20, 2026
AI Summary
The government file details specifications for the "Repair Intersection Runway 03-21 / 15-33" project at Joint Base Charleston – Air Base. This project involves the removal and replacement of 136 pavement panels, 25 ft x 25 ft x 24 inches deep, with new 26-inch deep panels, along with ancillary work such as asphalt milling, lighting installation, and pavement markings. The work will be conducted nightly, Thursday through Monday, between 2300 and 0700, requiring specialized equipment for fast-setting concrete to ensure the runway reopens daily. The document outlines stringent administrative requirements, including detailed project scheduling, safety protocols, and quality control. It mandates pre-construction submittals, such as a resume for the superintendent with 10 years of relevant experience, a comprehensive, cost-loaded CPM project schedule using Primavera P6, and adherence to specific work restrictions including dig permits and tobacco use policies.
01-Drawings JBC Final.pdf
PDF31510 KBMay 20, 2026
AI Summary
This government file outlines a comprehensive plan for a project involving work areas, test sites, and laydown areas, likely for infrastructure or airfield maintenance, given the references to runways, glide slopes, and localizer critical areas. The document details various logistical aspects, including haul routes, primary and secondary nightly equipment staging areas, and specific gates (V-7, V-5). It emphasizes safety, security, and coordination within work areas, particularly concerning unscheduled and emergency departure operations and buffer zones. The plan includes procedures for panel replacement, basic work area layouts, required phasing, and work area plans, presenting two distinct concepts with associated conceptual panel replacement and paving sequences. The document also addresses runway opening protocols by work area and includes a test section plan and procedure, indicating a detailed approach to project execution and quality assurance.
04- Recovered Material Certification.pdf
PDF900 KBMay 20, 2026
AI Summary
The document outlines the 100% Design Submittal for the Repair Intersection of Runway 03-21 / 15-33 at Joint Base Charleston – Air Base in North Charleston, South Carolina. Dated January 29, 2026, and referencing a "Recovered Materials Form," the submittal was prepared by James G. Jones, P.E. of ADC Engineering. The project is identified by JBC Project No. DKFX 1072314 and ADC Project No. 24300. The document also includes a digital signature from DUFFICY.THERESE.T.1591285897, an official from the U.S. Government, USAF, DoD, dated January 30, 2026. This file likely pertains to a federal government RFP or grant for infrastructure repair and upgrades at a military installation.
05- Wage Determination Highway SC20260034 Charleston SC.pdf
PDF30 KBMay 20, 2026
AI Summary
The General Decision Number SC20260034 outlines prevailing wage rates for highway construction projects in Berkeley, Charleston, Dorchester, and Horry Counties, South Carolina, effective January 2, 2026. It details specific hourly rates and fringes for various occupations including Carpenters (Form Work Only), Cement Masons, Ironworkers, Laborers (Asphalt, Common, Luteman, Mason Tender, Pipelayer, Traffic Control), Power Equipment Operators (Backhoe, Bulldozer, Crane, Grader, Hydroseeder, Loader, Mechanic, Milling Machine, Paver, Roller, Scraper, Screed, Tractor), and Truck Drivers (Dump, Lowboy). The document also includes important notes regarding Executive Order 13706 on Paid Sick Leave for Federal Contractors and Executive Order 13658 concerning the minimum wage for federal contractors. Procedures for adding unlisted classifications and appealing wage determinations are provided, along with explanations of various rate identifiers (Union, Union Average, Survey, State Adopted).
06 - Submittal Register.pdf
PDF231 KBMay 20, 2026
AI Summary
The document,
Solicitation - FA441826R0012.pdf
PDF862 KBMay 20, 2026
AI Summary
This document is a Request for Proposal (RFP) for the "Repair Intersection Runway 03-21 & 15-33" project at Joint Base Charleston-Air Base, South Carolina. The project involves removing and replacing 136 pavement panels, each 25 ft x 25 ft x 24 inches, at the intersection of the primary and secondary runways. The solicitation is issued as a full and open competition using tradeoff procedures. The performance period is 636 calendar days after receiving notice to proceed, with a mandatory performance bond and payment bond within 10 days of award. Offers are due by June 15, 2026, at 12:00 PM EST. The document also details specific line items for additional work such as asphaltic concrete shoulders, unsuitable soil removal, unforeseen spall repair, joint resealing, corner break repair, and additional airfield markings. It outlines inspection and acceptance procedures, delivery schedules, contract administration data including WAWF payment instructions, special contract requirements like a pre-proposal conference, performance and payment bond requirements, South Carolina business license tax, PKI certificates for past performance evaluation, required insurance, contractor access to installations, force protection conditions, sustainable procurement program, and security requirements for flight line access. Clauses on DEI discrimination, foreign procurements, and organizational conflicts of interest are also included.
02-Specificatons .FINAL.pdf
PDF5689 KBMay 11, 2026
AI Summary
This government file details the specifications for the "Repair Intersection Runway 03-21 / 15-33" project at Joint Base Charleston – Air Base, North Charleston, South Carolina. The project involves removing and replacing 136 pavement panels (25 ft x 25 ft x 24 inches with 26-inch deep replacements) at the intersection of the primary and secondary runways. Work is scheduled nightly from 2300 to 0700, Thursday through Monday, requiring specialized equipment for fast-setting concrete to ensure the runway reopens daily. Ancillary work includes asphalt shoulder milling and overlay, new runway lighting, markings, and pavement grinding/grooving. The document outlines general requirements, work restrictions including strict scheduling, base access, and permit procedures, and administrative requirements for supervision, pre-construction meetings, and electronic communications. It also details comprehensive project scheduling requirements, including critical path method (CPM) schedules, cost loading, activity durations, mandatory tasks, government activities, contract milestones, calendars incorporating weather delays and federal holidays, and detailed submission requirements for data files, narrative reports, and various schedule reports. The file emphasizes strict adherence to schedules, procedures for time extensions, and potential consequences for failing to achieve progress, ensuring meticulous planning and execution for this critical airfield repair.
03 - DKFX 1072314 - Total Performance Time.pdf
PDF153 KBMay 20, 2026
AI Summary
The document outlines the "Construction Performance Time Tabulation Form," a tool for calculating construction project timelines. It details steps for inserting project-specific data such as estimated Notice to Proceed (NTP), mobilization and submittal preparation days (e.g., 60 calendar days), special order materials lead time, and closeout submittal days (e.g., 45 calendar days). The form also incorporates monthly construction days and accounts for inclement weather, with a table showing monthly days, average inclement weather days, and percentages of impact. Key outputs include the total number of contract days, construction complete date, and estimated contract completion date. The data from this form is linked to a "Liquidated Damages" tab, emphasizing the importance of coordinating rates with contracting. For project DKFX 1072314: REPAIR INTERSECTION RW 3/21 & 15/33, the Period of Performance (PoP) is 636 days, with an estimated contract completion date of April 28, 2028.

Related Contract Opportunities

Project Timeline

postedOriginal Solicitation PostedMay 7, 2026
amendedAmendment #1· Description UpdatedMay 11, 2026
amendedAmendment #2· Description UpdatedMay 14, 2026
amendedLatest Amendment· Description UpdatedMay 20, 2026
deadlineResponse DeadlineJun 15, 2026
expiryArchive DateJun 30, 2026

Agency Information

Department
DEPT OF DEFENSE
Sub-Tier
DEPT OF THE AIR FORCE
Office
FA4418 628 CONS PK

Point of Contact

Name
Brian T. Hawk

Place of Performance

Charleston AFB, South Carolina, UNITED STATES

Official Sources