EAFB B-21 Alert Facility
ID: W9128F25SM016Type: Sources Sought
Overview

Buyer

DEPT OF DEFENSEDEPT OF THE ARMYW071 ENDIST OMAHAOMAHA, NE, 68102-4901, USA

NAICS

Commercial and Institutional Building Construction (236220)

PSC

CONSTRUCTION OF MISCELLANEOUS BUILDINGS (Y1JZ)
Timeline
    Description

    The Department of Defense, through the US Army Corps of Engineers-Omaha District, is seeking capable contractors for the upcoming B-21 Alert Facility project at Ellsworth Air Force Base in South Dakota. This project involves the construction of a 22,000 square foot lodging and readiness facility, along with an Aerospace Ground Equipment Warm Storage Facility, utilizing a design-bid-build approach. The work will include the demolition of existing structures, the construction of new facilities with specialized foundations, and adherence to military construction standards, including sustainability and antiterrorism requirements. Interested contractors must demonstrate substantial experience with similar projects and possess bonding capability of at least $50 million for single jobs. Responses to the Sources Sought Notice are due by 2:00 PM on January 28, 2025, and should be directed to James Willett at james.r.willett@usace.army.mil, with a copy to Brittany Gull at brittany.c.gull@usace.army.mil. The anticipated award date for the construction contract is in the second quarter of fiscal year 2026.

    Files
    Title
    Posted
    The Sources Sought Notice #W9128F25SM016 by the US Army Corps of Engineers-Omaha District aims to gauge the availability of capable small and other businesses for the upcoming B-21 Alert Facility project at Ellsworth AFB. This future solicitation will utilize a design-bid-build (DBB) approach for constructing a 22,000 sq ft lodging and readiness facility alongside an Aerospace Ground Equipment Warm Storage Facility. The project involves demolishing existing structures, constructing new facilities with special foundations, and ensuring alignment with various military construction standards, including sustainability and antiterrorism requirements. Contractors responding to this notice must provide specified company information, demonstrate substantial experience with similar construction projects, and show bonding capability of at least $50M for single jobs. The anticipated construction contract award is scheduled for the second quarter of fiscal year 2026. Responses are limited to 12 pages and must address the details of prior similar projects, including project costs and construction complexities. The government emphasizes that this notice does not equate to a formal solicitation and will not reimburse any costs incurred by respondents.
    Lifecycle
    Title
    Type
    EAFB B-21 Alert Facility
    Currently viewing
    Sources Sought
    Similar Opportunities
    B-21 60 Row EPS South
    Active
    Dept Of Defense
    The Department of Defense, specifically the U.S. Army Corps of Engineers Omaha District, is seeking responses to a Sources Sought Notice for the construction of five new pre-engineered metal Environmental Protection Shelters (EPSs) at Ellsworth Air Force Base in South Dakota. The project involves a design-bid-build delivery method and includes the construction of approximately 20,000 square feet of facilities designed to accommodate B-2A aircraft maintenance, along with associated airfield paving and support kiosks. This initiative is critical for enhancing the operational capabilities of the B-21 program and ensuring compliance with various Department of Defense construction standards. Interested contractors must submit their responses by 2:00 PM on January 28, 2025, to James Willett at james.r.willett@usace.army.mil, with a project magnitude estimated between $25 million and $100 million, and an anticipated contract award in the second quarter of fiscal year 2026.
    PLA Survey B-21 Alert Facility
    Active
    Dept Of Defense
    The Department of Defense, specifically the Army Corps of Engineers Omaha District, is soliciting feedback from the construction community regarding the potential use of Project Labor Agreements (PLA) for the upcoming construction of the B-21 Alert Facility at Ellsworth Air Force Base in South Dakota. This project involves the construction of a 22,000 square foot lodging and readiness facility for B-21 air crews, along with an Aerospace Ground Equipment Warm Storage Facility, and is expected to exceed $35 million in cost. The use of PLAs is intended to promote efficiency and stability in labor management for large-scale federal construction projects, and interested parties are invited to submit their comments by 2:00 p.m. CST on January 28, 2025, to James Willett at james.r.willett@usace.army.mil, with a courtesy copy to Brittany Gull at brittany.c.gull@usace.army.mil. The estimated construction contract award is anticipated in the second quarter of Fiscal Year 2026, with a project magnitude between $25 million and $100 million.
    B-21 ADAL Ops/AMU facility at Ellsworth Air Force Base (EAFB), South Dakota (SD)
    Active
    Dept Of Defense
    The Department of Defense, through the Department of the Army, is preparing to solicit bids for the construction of the B-21 ADAL Operations and Aircraft Maintenance Unit facility at Ellsworth Air Force Base in South Dakota. This project falls under the NAICS code 236220, which pertains to Commercial and Institutional Building Construction, and aims to enhance operational capabilities at the base. The successful contractor will be responsible for the construction of miscellaneous buildings as outlined in the presolicitation notice, with further details available in the attached document. Interested parties should direct inquiries to Gloria Garside at gloria.garside@usace.army.mil or Amanda Eaton at amanda.e.eaton@usace.army.mil, as telephone calls will not be accepted.
    FY26 EAFB - Munitions Maintenance (MUNS MX), Ellsworth AFB, South Dakota (SD)
    Active
    Dept Of Defense
    The Department of Defense, through the U.S. Army Corps of Engineers, Omaha District, is conducting market research for the FY26 Munitions Maintenance (MUNS MX) project at Ellsworth Air Force Base in South Dakota. This opportunity seeks responses from potential prime construction contractors with a bonding capability of at least $30 million to design and construct a new maintenance storage facility, which will include demolition of existing structures and compliance with various Department of Defense standards. The project is significant for enhancing munitions maintenance capabilities and is estimated to have a construction contract value between $25 million and $100 million, with an anticipated award in the second or third quarter of fiscal year 2026. Interested contractors must submit their qualifications and experience by 2:00 p.m. CDT on January 7, 2025, to the primary contact, Thomas McFall, at thomas.g.mcfall@usace.army.mil, with a courtesy copy to Brittany Gull at brittany.c.gull@usace.army.mil.
    B-21 East Alert Apron
    Active
    Dept Of Defense
    The Department of Defense, specifically the Department of the Army through the Omaha District, is soliciting bids for the construction of the B-21 East Alert Apron project. This design-bid-build construction initiative involves the installation of four pre-engineered metal Environmental Protection Shelters (EPS), each approximately 20,000 square feet, designed to accommodate B-2A aircraft and facilitate general maintenance, along with associated airfield paving and support facilities. The project is critical for enhancing operational capabilities at the existing Alert Apron at EAFB and must comply with stringent DoD construction standards, including sustainability and antiterrorism requirements. Interested contractors can reach out to Gloria Garside at gloria.garside@usace.army.mil or Amanda Eaton at amanda.e.eaton@usace.army.mil for further details.
    PLA Survey Ellsworth AFB B-21 60 Rows South EPSs
    Active
    Dept Of Defense
    The Department of Defense, through the U.S. Army Corps of Engineers Omaha District, is soliciting input from the construction industry regarding the potential use of Project Labor Agreements (PLAs) for a large-scale construction project at Ellsworth Air Force Base in South Dakota, with a budget exceeding $35 million. The project involves the construction of five new pre-engineered metal Environmental Protection Shelters (EPSs) designed to accommodate B-2A aircraft, along with associated support facilities, and must adhere to stringent Department of Defense standards. Interested parties are invited to submit their comments on the use of PLAs, addressing various factors such as local labor availability and project scheduling, by 2:00 p.m. CST on January 28, 2025, to the designated contacts, James Willett and Brittany Gull, via the provided email addresses. The estimated construction contract award is anticipated in the second quarter of Fiscal Year 2026, with a project completion timeframe of 730 calendar days from the notice to proceed.
    PLA Survey - FY26 EAFB - Munitions Maintenance (MUNS MX), Ellsworth AFB, South Dakota (SD)
    Active
    Dept Of Defense
    The Department of Defense, through the Corps of Engineers Omaha District, is soliciting comments from the construction community regarding the potential use of Project Labor Agreements (PLA) for a large-scale construction project at Ellsworth Air Force Base in South Dakota. The project involves the construction of a new Munitions Maintenance Storage Facility, which will include various specialized construction requirements and adhere to Department of Defense standards. The estimated construction contract value is between $25 million and $100 million, with a projected award date in the second or third quarter of Fiscal Year 2026. Interested parties must submit their survey responses by 2:00 p.m. CDT on January 7, 2025, to Thomas McFall at thomas.g.mcfall@usace.army.mil, with a courtesy copy to Brittany Gull at brittany.c.gull@usace.army.mil.
    PLA Survey - FY26 EAFB - 80 Row EPS, Ellsworth AFB, South Dakota (SD)
    Active
    Dept Of Defense
    The Department of Defense, specifically the Corps of Engineers Omaha District, is soliciting input from the construction community regarding the potential use of Project Labor Agreements (PLA) for a large-scale construction project at Ellsworth Air Force Base in South Dakota. The project involves the construction of six pre-engineered metal Environmental Protection Shelters (EPS) and associated facilities, with a total estimated construction cost between $25 million and $100 million, and is expected to be funded primarily through MILCON appropriations. Interested parties are encouraged to provide feedback on the use of PLAs, including insights on local labor availability, project scheduling, and the potential benefits or drawbacks of implementing a PLA for this project. Responses must be submitted via email by 2:00 p.m. CDT on January 7, 2025, to Thomas McFall at thomas.g.mcfall@usace.army.mil, with a courtesy copy to Brittany Gull at brittany.c.gull@usace.army.mil.
    Pavement & Maintenance Facility, Grand Forks AFB, ND
    Active
    Dept Of Defense
    The Department of Defense, through the U.S. Army Corps of Engineers, Omaha District, is conducting market research for a potential construction project involving a Pavement & Maintenance Facility at Grand Forks Air Force Base, North Dakota. The project aims to construct a 60,000 square foot storage and light maintenance facility for snow removal equipment, including the demolition of existing structures and the installation of supporting facilities such as liquid storage tanks and generators. This opportunity is significant for contractors with experience in similar construction projects, particularly those involving military installations and compliance with DoD design standards. Interested prime contractors with bonding capabilities of at least $65 million must submit their qualifications by 2:00 p.m. CDT on January 7, 2025, to Scott Dwyer at Scott.Dwyer@usace.army.mil, with a courtesy copy to Jessica R. Jackson at jessica.r.jackson@usace.army.mil. The estimated construction contract award is anticipated in the second or third quarter of fiscal year 2026, with a project magnitude between $25 million and $100 million.
    B-21 60 Row Environmental Protection Shelters - North
    Active
    Dept Of Defense
    The Department of Defense, specifically the Department of the Army through the Omaha District, is soliciting bids for the construction of five new pre-engineered metal Environmental Protection Shelters (EPS) designed to accommodate B-2A "Spirit" aircraft, each covering approximately 20,000 square feet. The project aims to facilitate general aircraft maintenance and includes the installation of associated airfield and ground support equipment (GSE) paving, as well as two maintenance kiosks providing essential electrical and communication infrastructure. This initiative is critical for enhancing operational capabilities and ensuring compliance with AFI 16-1404 requirements. Interested contractors can reach out to Scott Dwyer at Scott.Dwyer@usace.army.mil or call 402-995-2584 for further details.