Two Phase Design-Build/Design-Bid-Build (DB/DBB) Multiple Award Task Order Contract (MATOC) for Construction of the Ground Based Strategic Deterrent (GBSD) Utility Corridor (UC) at Francis E. Warren Air Force Base (FEW AFB), Wyoming (WY)
Contract Opportunity Analysis
The U.S. Army Corps of Engineers Omaha District, for the Department of the Army, is soliciting a two-phase design-build/design-bid-build multiple award task order contract to construct the Ground Based Strategic Deterrent utility corridor at Francis E. Warren Air Force Base in Wyoming. The work centers on utility corridor construction under a MATOC structure, with Phase Two seed project specifications and drawings incorporated into the acquisition. The solicitation highlights Controlled Unclassified Information access controls and states that vendors must be registered in both SAM and the Procurement Integrity Enterprise Environment, with compliance required for NIST and Cybersecurity Maturity Model Certification requirements. The opportunity is described as a $1.7 billion acquisition, and the primary contact listed is Brandon Landis at the Omaha District.