ContractSolicitationTotal Small Business Set-Aside (FAR 19.5)

Renovations to Sugarcane Field Stations Building 1 (Canal Point, FL)

DEPARTMENT OF AGRICULTURE 1232SA25Q0988
Response Deadline
Sep 29, 2025
Deadline passed
Days Remaining
0
Closed
Set-Aside
Total Small Business Set-Aside (FAR 19.5)
Notice Type
Solicitation

Contract Opportunity Analysis

The U.S. Department of Agriculture's Agricultural Research Service (USDA ARS) is soliciting offers for renovations to the Sugarcane Field Stations Building 1, also known as the Laboratory Building, located in Canal Point, Florida. The project entails comprehensive renovations, including the replacement of outdated flooring, lighting, and cabinetry, with a total project value estimated between $100,000 and $250,000. Contractors are required to provide all necessary labor, supervision, tools, and materials, while adhering to federal regulations, including the use of biobased products and compliance with prevailing wage rates. Proposals are due by September 29, 2025, at 12:00 p.m. Eastern Time, and should be submitted via email to Spencer Hamilton at spencer.hamilton@usda.gov, referencing solicitation number 1232SA25Q0988. The period of performance for the project is set for 270 calendar days following the notice to proceed.

Classification Codes

NAICS Code
236220
Commercial and Institutional Building Construction
PSC Code
Y1JZ
CONSTRUCTION OF MISCELLANEOUS BUILDINGS

Solicitation Documents

5 Files
Attachment 1 1442 RFQ_12905B25Q0988.pdf
PDF482 KBSep 23, 2025
AI Summary
The USDA ARS is soliciting offers for renovations to the Sugarcane Field Stations Building 1 (Laboratory Building) in Canal Point, FL. The project, valued between $100,000 and $250,000, requires replacing and modernizing outdated flooring, lighting, and cabinetry. Contractors must provide all labor, supervision, tools, and materials. Proposals are due by September 29, 2025, 12:00 p.m. Eastern Time, via email to spencer.hamilton@usda.gov, referencing solicitation number 1232SA25Q0988. The period of performance is 270 calendar days after the notice to proceed. The solicitation emphasizes the use of biobased products, compliance with various federal regulations including OSHA, and the necessity of performance and payment bonds for awards exceeding $35,000. Detailed requirements for invoicing, contract closeout, work schedules, permits, and property damage liability insurance are also outlined.
Attachment 2 Statement of Work.pdf
PDF4991 KBSep 23, 2025
AI Summary
This Statement of Work outlines the comprehensive renovation of Room 114, also known as the Laboratory Building, at the USDA, ARS Sugarcane Field Station in Canal Point, FL. The contractor is responsible for providing all necessary materials, personnel, and equipment to complete the renovation, adhering to all local, state, and federal labor laws. The scope includes extensive demolition, such as removing existing benchtops, sinks, plumbing, flooring, and lighting. A critical aspect of the demolition involves the identification and abatement of asbestos-containing VCT and cove base, requiring a licensed asbestos inspector and abatement company. The project also entails significant electrical upgrades, including replacing fluorescent lights with LED fixtures and installing new electrical circuits and outlets. New commercial-grade Vinyl Composite Tile flooring will be installed, followed by stripping and waxing. The room will be repainted with specific Sherwin Williams products or equivalents. Finally, new laboratory cabinetry, including base and wall cabinets, countertops, sinks, and associated fixtures, will be supplied and installed according to provided drawings and specifications. The government will provide utilities, but no other services. The contractor is responsible for all cleanup and disposal of construction debris. Work hours are 7:30 am to 4:00 pm, Monday through Friday, excluding federal holidays, with any exceptions requiring prior approval.
Attachment 3 DOL WD FL20250220_2025_07_18.pdf
PDF35 KBSep 23, 2025
AI Summary
This government file, General Decision Number FL20250220, outlines prevailing wage rates for building construction projects in Palm Beach County, Florida, effective July 18, 2025. It details minimum wage requirements under Executive Orders 14026 ($17.75/hour) and 13658 ($13.30/hour) for covered federal contracts, with specific applicability dates. The document lists various craft classifications—such as Asbestos Worker, Carpenter, Electrician, Elevator Mechanic, and multiple Operator roles—along with their respective hourly rates and fringe benefits. It also includes information on Executive Order 13706, which mandates paid sick leave for federal contractors. The file provides guidance on identifying union, union average, survey, and state-adopted wage rates, and outlines a comprehensive appeals process for wage determination matters, including contacts for initial decisions and review requests.
Attachment 4 ARS-371 - CONSTRUCTION PROGRESS AND PAYMENT SCHEDULE.pdf
PDF52 KBSep 23, 2025
AI Summary
The U.S. Department of Agriculture's Agricultural Research Service (USDA-ARS) Form ARS-371, titled "Construction Progress and Payment Schedule," is a crucial document for federal government contracts, particularly in construction. This form is used to track the progress of work and schedule payments, and it must be submitted within 14 calendar days of receiving a Notice to Proceed. It requires contractors to provide a detailed breakdown of each branch of work, including its dollar value (Column A), percentage of the total project (Column B), and approximate start and completion dates (Columns C and D). The form also mandates the completion of administrative details such as contract number, amount, project location, and contractor's information. Although partial payments are not always requested, the form is still required. If partial payments are requested, an approved copy of Form ARS-371 must accompany each Payment Request (Form ARS-372), with Columns E, F, and G detailing the work completed. The contractor must sign and submit the form for approval by the Contracting Officer, who will return an approved copy for the contractor's records. This ensures clear communication, accountability, and proper financial management throughout the construction project.
Attachment 5 ARS-372 - CONTRACTOR REQUEST FOR PAYMENT TRANSMITTAL.pdf
PDF30 KBSep 23, 2025
AI Summary
The USDA-ARS Form ARS-372 is a Contractor's Request for Payment Transmittal used for federal government contracts, including RFPs and grants. It details payment requests for work completed, materials stored, and adjustments from change orders, providing a comprehensive financial overview. The form requires certification from the contractor, affirming compliance with contract terms, timely payments to subcontractors, and that the request does not include withheld amounts. It also requires recommendation and concurrence signatures from government representatives like the EPM or COR. This document is crucial for financial management and accountability in government projects, ensuring adherence to federal regulations and proper disbursement of funds.

Related Contract Opportunities

Project Timeline

postedOriginal Solicitation PostedSep 23, 2025
deadlineResponse DeadlineSep 29, 2025
expiryArchive DateOct 14, 2025

Agency Information

Department
DEPARTMENT OF AGRICULTURE
Sub-Tier
AGRICULTURAL RESEARCH SERVICE
Office
USDA ARS AFM APD

Point of Contact

Name
Spencer Hamilton

Place of Performance

Canal Point, Florida, UNITED STATES

Official Sources