WWYK250063 - INSTALL REACT VII FACILITY, B9001, POST V19
Contract Opportunity Analysis
The Department of the Air Force, Air Force Sustainment Center at Tinker Air Force Base, is seeking proposals for project WWYK250063 to install a new, multi-trade React VII Facility in Building 9001, Post V19. The contractor must deliver a complete, hybrid design-build project encompassing architectural, structural, fire protection, mechanical, and electrical disciplines, which includes concrete slab remediation, structural steel framed superstructure installation, new HVAC systems, and low-voltage communication infrastructure. The work must comply with strict base standards such as NFPA codes, Unified Facilities Criteria, and Tinker Air Force Base Facility Standards, with a performance period of 240 calendar days from the receipt of the Notice to Proceed. This solicitation is a 100% Women-Owned Small Business set-aside, requires mandatory attendance at an initial base site visit to be eligible to propose, and has a proposal deadline of 2:00 PM local time on July 17, 2026.