MORA LONGMIRE FIBER INSTALL
Contract Opportunity Analysis
The National Park Service is seeking a contractor to install underground telecommunications conduit at the Longmire operations center within Mount Rainier National Park in Ashford, Washington. The project requires installing approximately 2,200 linear feet of three-inch rigid PVC conduit, pull tape, detectable tracer wire, and five subsurface handholes across three distinct geographic sections. Contractors must adhere to strict park restrictions, including a three-ton gross vehicle weight limit on the Longmire Suspension Bridge, mandatory vehicle power-washing to prevent invasive species, and archaeological monitoring during all ground-disturbing activities. This opportunity is set aside 100% for Service-Disabled Veteran-Owned Small Businesses, carries an estimated value between $50,000 and $200,000, and requires proposals to be submitted electronically to Contract Specialist Michael Abner by 12:00 PM local time on August 18, 2026.