The Department of the Army, through W7M6 USPFO Activity ILANG 126, is planning a presolicitation for roof repair work at Scott AFB, Illinois. The project centers on replacing the failed modified bitumen roof and related exterior roofing components, including metal roof panels, a new roof on an addition, a flat seam roof, trim, ridge caps, precast concrete caps, and replacement of existing metal siding, along with interior mold detection or remediation and finish restoration where water intrusion has occurred. The work is driven by a roof inspection that rated the main roof section as degraded and recommended full replacement, and the place of performance is listed as Mt Zion, Illinois. This is anticipated as a total small business set-aside and an Invitation for Bid under sealed bidding is expected, but no solicitation will be issued until funds are secured; the estimated magnitude is between $1,000,000 and $3,000,000.

Classification Codes

NAICS Code
236220
Commercial and Institutional Building Construction
PSC Code
Z1JZ
MAINTENANCE OF MISCELLANEOUS BUILDINGS

Solicitation Documents

1 Files
roof.png
PNG155 KBMay 20, 2026
AI Summary
The document outlines a roof replacement and exterior modification project, likely part of a government Request for Proposal (RFP) for construction or renovation services. Key aspects include replacing a section of the existing modified bituminous roof with new metal roof panels on the existing structure, adding a new modified bituminous roof to an addition, and installing a new flat seam roof. The project also specifies new metal trim, ridge caps by the metal roof manufacturer, and precast concrete caps. Additionally, existing metal siding on a wall is to be replaced. The record drawings, dated September 2000, emphasize that they are based on information compiled by others and are not intended to represent exact details or construction methods. The engineer disclaims responsibility for errors or omissions. This document provides essential details for potential bidders on a government contract for building exterior upgrades.

Related Contract Opportunities

Project Timeline

postedOriginal Solicitation PostedMay 20, 2026
deadlineResponse DeadlineJun 4, 2026
expiryArchive DateJun 19, 2026

Agency Information

Department
DEPT OF DEFENSE
Sub-Tier
DEPT OF THE ARMY
Office
W7M6 USPFO ACTIVITY ILANG 126

Point of Contact

Name
Capt Christopher Fisher

Place of Performance

Mt Zion, Illinois, UNITED STATES

Official Sources