Rehabilitation of a bridge/water control structure
ID: 140FGA25Q0003Type: Solicitation
Overview

Buyer

INTERIOR, DEPARTMENT OF THEUS FISH AND WILDLIFE SERVICEFWS, GAOAFalls Church, VA, 22041, USA

NAICS

Highway, Street, and Bridge Construction (237310)

PSC

REPAIR OR ALTERATION OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS (Z2LB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)
Timeline
    Description

    The Department of the Interior, through the U.S. Fish and Wildlife Service, is soliciting bids for the rehabilitation of a bridge and water control structure at the Quivira National Wildlife Refuge in Stafford, Kansas. The project involves significant structural repairs, including a full-depth repair of Cell #3 of the C1 Bridge, which is crucial for both vehicular access and water management within the refuge. This initiative is vital for maintaining public infrastructure and ensuring compliance with environmental and safety regulations, as the bridge has shown signs of deterioration that could impact its load capacity and safety. Interested contractors should note that the estimated contract value is between $25,000 and $100,000, with a project completion timeline of 180 days following the notice to proceed. For further inquiries, contact Shanen Fox at shanen_fox@fws.gov or call 503-736-4469.

    Point(s) of Contact
    Files
    Title
    Posted
    The document pertains to the C1 Bridge / WCS Repair project located at Quivira National Wildlife Refuge, identified by Engineering Project Number 25-005. It serves as a detailed outline for the projected submittal list necessary for advancing the project. The list includes essential items such as waste records, closeout documents, a construction schedule, and an operations and maintenance manual, alongside specific comments for each submittal type based on its approval status (A to E). The purpose of this document is to ensure compliance with project specifications and to facilitate effective communication regarding the requirements for project documentation. This approach underscores the importance of meticulous planning and adherence to governmental guidelines for federal and state projects, emphasizing crucial aspects like waste management and erosion control while detailing the necessary approvals for the various submissions. The structure is straightforward, repeating essential information over three sheets to maintain clarity and consistency in documentation.
    The document outlines a bidding schedule for the repair of the C1 Bridge (Project No. 25-005) located at Quivira National Wildlife Refuge in Stafford, Kansas. The bridge, built in 1964, is a three-barrel box culvert that is crucial for providing access between the U.S. Fish and Wildlife Service (USFWS) Headquarters and the rest of the refuge. The repair project aims to address a full depth repair of Cell #3 and undertake concrete repairs across all three cells to extend the lifespan of the structure. Key components of the bidding include general mobilization, demobilization, materials, labor, and equipment costs, although specific dollar amounts for each category are not disclosed in the document. The proposed repairs are essential for maintaining the bridge’s functionality as both a vehicular thoroughfare and a water control structure. Overall, the document serves to initiate formal solicitations for bids, ensuring compliance with federal requirements for public works projects related to infrastructure maintenance by government entities.
    The document outlines the requirements for a structural repair contract concerning the C1 Bridge/Water Control Structure (WCS) at the Quivira National Wildlife Refuge in Stafford, Kansas. It details the project's scope, background, and necessary coordination with stakeholders, emphasizing safety, environmental protection, and adherence to applicable codes and standards. The contractor is responsible for comprehensive structural repair and rehabilitation of Cell #3, including concrete removal, replacement, and reinforcement. Work restrictions are outlined, such as approved working hours and coordination with existing utilities, and the contractor must obtain necessary permits. The document also specifies project management procedures, including coordination meetings, quality control, and submittal processes for varying project documents, ensuring that all construction actions comply with federal, state, and local regulations. Overall, it serves as a guide for effective project execution while prioritizing safety and compliance in government contracting.
    The Quivira National Wildlife Refuge is soliciting a contractor to rehabilitate the C1 Bridge, a vital water control structure and traffic conduit built in 1964. The project includes structural repairs as identified in a 2024 engineering report, emphasizing compliance with all relevant federal, state, and local regulations. Key tasks involve a full-depth repair of Cell #3, including slab replacement, reinforcing steel preparation, and concrete application using specified materials. Safety protocols, environmental pollution control, and compliance with noise and waste management regulations are paramount. The contractor must secure necessary permits and submit documentation for all materials and methods used. The project timeline extends 180 days following the Notice to Proceed, with specific provisions for site restoration and traffic regulation. The contractor bears full liability for adherence to these specifications and must coordinate activities with the Refuge Manager to minimize environmental impacts. This rehabilitation effort represents a commitment to infrastructure preservation at the Quivira National Wildlife Refuge, enhancing both safety and ecological stewardship.
    The document outlines a solicitation for a construction contract (Solicitation No. 140FGA25Q0003) focused on the rehabilitation of a bridge and water control structure at the Quivira National Wildlife Refuge in Stafford, Kansas. The project requires contractors to begin work within 5 calendar days of receiving the notice to proceed and to complete it within 180 calendar days. The contract includes provisions for performance and payment bonds, with a total estimated cost between $25,000 and $100,000. Key sections include a Statement of Work (SOW) detailing specifications and requirements, environmental compliance measures, and special contract provisions addressing work hours, hazardous materials, and preservation of archaeological data. Reporting and invoicing procedures are specified, including requirements for electronic invoicing through the Treasury's Invoice Processing Platform (IPP). The solicitation emphasizes the availability of funds and encourages small business participation in accordance with federal regulations. The emphasis on compliance with environmental regulations, safety standards, and prompt payment reflects the government’s commitment to responsible contracting practices. Overall, this solicitation is a structured request aimed at improving public infrastructure while ensuring compliance with legal and environmental standards.
    TranSystems was authorized in November 2023 to evaluate the condition of Bridge C1 at the Quivira National Wildlife Refuge in Stafford, KS, for a load capacity analysis. The three-cell reinforced concrete box culvert (RCB), built in 1964, has no available design or as-built plans, necessitating assumptions about material properties per AASHTO standards. The field evaluation conducted in December 2023 revealed significant deterioration, particularly a spall in the ceiling of one cell, which was factored into the load rating analysis. Utilizing AASHTOWare BrR software, a model was developed to assess the structure based on field measurements. Key findings show the overall condition of the culvert as "Fair," with reduced load ratings for various legal trucks and emergency vehicles due to structural issues. Emergency vehicle maximum posting is limited to 8 tons based on analysis results, indicating a potential safety concern. The report includes several repair alternates alongside cost estimates for construction, emphasizing the need for urgent attention to maintain safety and structural integrity. This documentation serves as a critical resource for federal and local authorities in determining funding and actions necessary for infrastructure maintenance and rehabilitation in compliance with government standards.
    The document appears to be a corrupted or improperly formatted data file that lacks coherent content relevant to government RFPs, federal grants, or any specific governmental topic. The visible characters simulate patterns typical of encoded data, resulting in unreadable segments scattered throughout. No identifiable main topic, key ideas, or supporting details can be extracted due to the overwhelming presence of nonsensical text and formatting errors. Given the context of government RFPs and federal grants, a typical document would provide details regarding project proposals, funding opportunities, eligibility criteria, application processes, and deadlines. However, this specific file fails to convey any of these critical elements, rendering it impossible to summarize effectively in terms of actionable information or context. In conclusion, without substantial readable content, the corrupted file serves no practical purpose in the understanding of government contracts or grants, and further investigation or retrieval of a valid version would be necessary to present relevant information.
    Lifecycle
    Title
    Type
    Similar Opportunities
    OR - KLAMATH MARSH NWR - REPAIR/REPLACE OF FENCING
    Active
    Interior, Department Of The
    The U.S. Fish and Wildlife Service (FWS) is seeking quotes for the repair and replacement of approximately 3.5 miles of wildlife-friendly fencing at the Klamath Marsh National Wildlife Refuge, following damage caused by a recent fire. The project includes the installation of up to six gates and requires adherence to specific wildlife-friendly guidelines, with a maximum budget of $42,350. This initiative is crucial for restoring and maintaining wildlife habitats, reflecting the government's commitment to environmental conservation. Interested small businesses must submit their quotations by 4:00 PM PT on August 9, 2024, and must be registered as active vendors on the System for Award Management (SAM) to be eligible for consideration.
    Bill Williams River NWR Well
    Active
    Interior, Department Of The
    The U.S. Fish and Wildlife Service (FWS) is seeking qualified contractors for the Bill Williams River National Wildlife Refuge (BWRNWR) well installation project in La Paz County, Arizona. The project involves the construction of a 6-inch diameter groundwater well, with a depth of at least 100 feet, to support irrigation for newly planted native trees in a 60-acre area affected by a recent wildfire. This initiative is crucial for ecological restoration and aligns with federal efforts to enhance wildlife habitats. Interested vendors must submit their quotations by January 8, 2025, with an estimated project cost ranging from $100,000 to $250,000, and are encouraged to contact Tiffany Breske at TiffanyBreske@fws.gov or 612-713-5187 for further details.
    Z--AL-EUFAULA NWR-DQ126-REHAB INLET PUMP
    Active
    Interior, Department Of The
    The Department of the Interior, through the U.S. Fish and Wildlife Service, is soliciting proposals for the rehabilitation of the Inlet Pump at the Eufaula National Wildlife Refuge in Alabama. The project aims to refurbish various components of the pump system, ensuring compliance with environmental regulations and operational efficiency, with a construction budget estimated between $250,000 and $500,000. This rehabilitation is critical for maintaining water supply and irrigation systems within the refuge, highlighting the importance of sustainable practices in federal construction projects. Interested contractors must submit their proposals by December 23, 2024, at noon EST, and can direct inquiries to Tiffannie Pannell at tiffanniepannell@fws.gov or by phone at 505-248-6792.
    Plum Island Boathouse Foundation Repairs
    Active
    Interior, Department Of The
    The U.S. Fish and Wildlife Service (USFWS) is soliciting proposals for the Plum Island Boathouse Foundation Repairs project, located at the Green Bay National Wildlife Refuge in Door County, Wisconsin. The project aims to repair the historic boathouse foundation piers, which are part of a National Register of Historic Places district, and requires compliance with the Secretary of the Interior’s Standards for the Treatment of Historic Properties. This total small business set-aside opportunity has an estimated contract value between $500,000 and $1,000,000, with proposals due by the specified deadline. Interested contractors should contact Contracting Officer Tiffany Breske at TiffanyBreske@fws.gov for further details and ensure they have all necessary documentation for submission.
    Z--Arroyo Canal Fish Screen/Sack Dam Fish Passage
    Active
    Interior, Department Of The
    The Department of the Interior, through the Bureau of Reclamation, is soliciting proposals for the Arroyo Canal Fish Screen and Sack Dam Fish Passage Project, aimed at enhancing fish passage and ecological conditions along the San Joaquin River in California. The project involves extensive construction activities, including the installation of fish screens, dewatering, and rehabilitation of existing structures, with a total estimated contract value between $100 million and $200 million. This initiative is critical for improving local infrastructure and supporting environmental restoration efforts, ensuring compliance with federal regulations throughout the project lifecycle. Interested contractors must submit their proposals by December 19, 2024, and can direct inquiries to Sydney Johnson at sgjohnson@usbr.gov or by phone at 916-978-5431.
    Y--GVIC FISH SCREEN REHABILITATION
    Active
    Interior, Department Of The
    The Department of the Interior, through the Bureau of Reclamation, is soliciting bids for the rehabilitation of fish screens at the Grand Valley Irrigation Company (GVIC) located in Mesa County, Colorado. This project, estimated to cost between $1,000,000 and $5,000,000, aims to enhance water infrastructure as part of the Upper Colorado River Endangered Fish Recovery Program, focusing on the installation of new concrete structures and fish screens, along with a control and cleaning system. The rehabilitation is crucial for preserving aquatic ecosystems and ensuring compliance with environmental regulations. Interested small businesses must submit their sealed bids by January 29, 2025, with inquiries due by January 10, 2025, and the expected performance period running from April 1, 2025, to May 1, 2026. For further details, potential bidders can contact Ana Fife at afife@usbr.gov or by phone at 801-524-3671.
    Y--NV ASH MEADOWS NWR CRY SPRNGS RESTORE
    Active
    Interior, Department Of The
    The U.S. Fish and Wildlife Service, under the Department of the Interior, is soliciting proposals for design/build services aimed at restoring the Crystal Springs outflow and associated infrastructure at the Ash Meadows National Wildlife Refuge in Nevada. The project involves the decommissioning and removal of existing dams, construction of new outflow channels, and enhancements to visitor access, with a focus on ecological restoration and habitat improvement for endangered species. This initiative is critical for restoring natural hydrology and biodiversity in the region, addressing past agricultural impacts, and ensuring compliance with federal environmental regulations. Interested contractors must submit their sealed proposals by January 30, 2025, with the contract performance period running from April 1, 2025, to September 12, 2028. For further inquiries, contact Ian Young at ianayoung@fws.gov or call 612-713-5214.
    LOLO NATIONAL FORES T - Upper West Fork Fish Creek Trail Bridge Replacement
    Active
    Agriculture, Department Of
    The U.S. Department of Agriculture's Forest Service is seeking contractors for the Upper West Fork Fish Creek Trail Bridge Replacement project located in the Lolo National Forest, Montana. The project involves the removal and replacement of an existing trail bridge along Trail 101 at milepost 3.1, including structural excavation and the installation of a new bridge, while adhering to specific Resource Protection Measures due to its location in a proposed wilderness area. This initiative is crucial for maintaining infrastructure within the national forest and ensuring safe access for visitors, with an estimated construction cost between $500,000 and $1,000,000. Interested vendors are encouraged to attend a formal site visit on October 17, 2024, and must notify the primary contact, Alisha Knaub, at alisha.knaub@usda.gov by October 15, 2024, to confirm attendance.
    Roof work - MA
    Active
    Interior, Department Of The
    The U.S. Fish and Wildlife Service (FWS) is seeking proposals from qualified contractors for roofing and siding work on Quarters 5 at the Eastern Massachusetts National Wildlife Refuge in Sudbury, MA. The project involves replacing an existing asphalt shingle roof and deteriorated siding, with specific requirements for new roofing materials, flashings, and vent boots, while maintaining existing gutters and fascia boards. This maintenance work is crucial for ensuring the building's functionality and compliance with federal safety and quality standards. Interested small businesses must submit their proposals by January 6, 2025, following a pre-proposal site visit on December 23, 2024, with an estimated project value between $100,000 and $250,000. For further inquiries, contact Christine Beauregard at ChristineBeauregard@fws.gov or call 413-253-8232.
    Y--NV Upper Carson Slough Backcountry Trail System
    Active
    Interior, Department Of The
    The U.S. Fish and Wildlife Service is preparing to issue a Request for Proposal (RFP) for the construction of the NV Upper Carson Slough Backcountry Trail System. This procurement, categorized under NAICS code 237990, aims to engage small businesses in a Firm Fixed Price contract, with evaluations based on technical approach, past performance, key personnel capabilities, work schedule, and price. The project is significant for enhancing outdoor recreational opportunities and conservation efforts in the area. Interested contractors must be registered in the System for Award Management (SAM) and can expect key documents, including the Statement of Work, to be posted around January 2, 2025. For inquiries, contact Shannon Barnhill at shannonbarnhill@fws.gov.