Self-Propelled Howitzer-Modernization Evaluation Draft L&M
ID: SPHM_Draft_0003Type: Special Notice
Overview

Buyer

DEPT OF DEFENSEDEPT OF THE ARMYW6QK ACC- DTAWARREN, MI, 48397-5000, USA
Timeline
    Description

    The Department of Defense, specifically the Army Contracting Command – Detroit Arsenal (ACC-DTA), is seeking industry feedback on the draft scope for the Self-Propelled Howitzer Modernization Evaluation, with the aim of refining requirements ahead of a planned production contract by FY30. This opportunity involves a nine-month evaluation of non-developmental 155mm self-propelled howitzer systems at Yuma Proving Ground, Arizona, where contractors will be responsible for providing necessary equipment, personnel, and comprehensive reporting on various performance and safety metrics. The initiative is crucial for enhancing military capabilities and ensuring operational readiness, with a focus on compliance with stringent testing and reporting standards. Interested vendors must submit their responses, including company details and feedback on the draft, by 5 p.m. EST on December 5, 2024, to the primary contacts Sarah Teschler and MAJ Lindsay Hobbs.

    Point(s) of Contact
    Files
    Title
    Posted
    The Army Contracting Command – Detroit Arsenal (ACC-DTA) has issued a draft scope and sections L and M for the upcoming solicitation regarding the Self-Propelled Howitzer Modernization Evaluation. This draft is open for industry comments and questions before its final version is published in the second quarter of FY25. Vendors are encouraged to provide feedback on potential issues and suggested changes to enhance the draft’s viability for firms. This notice serves informational purposes and does not imply a formal Request for Quote (RFQ) or commitment from the government. Responses are required from interested vendors, including company details, feedback on the draft, delivery timelines, personnel requirements for testing, and potential export regulation issues. Specific questions regarding the testing plan and documentation needed have been included to help the government assess industry capabilities. This process aims to refine the requirements, ensuring industry feasibility while preparing for future contracting opportunities. Overall, this initiative underscores the government's commitment to engaging with industry stakeholders to align expectations and improve project outcomes.
    The document provides definitions related to the System of Systems for self-propelled artillery as part of a federal contract. It outlines key components, including how these systems interact to fulfill artillery missions, emphasizes the exclusion of certain tactical equipment, and defines various related terms such as “system,” “subsystem,” “battery,” and “mobility operations.” A “self-propelled howitzer vehicle” is specified as an artillery platform capable of independent operation, while the “resupply system” involves logistical support for ammunition delivery. The document details different types of ammunition—highlighting their lethal and non-lethal capabilities—as essential for the operational effectiveness of the artillery systems. Overall, the purpose of this document is to clarify the terminology and functional definitions crucial for government contracts related to self-propelled artillery systems, ensuring standardized understanding for procurement processes. This framework enables diverse stakeholders to align with operational protocols and equipment standards necessary for military readiness.
    The document outlines the Test Support Assumptions for evaluating the Self-Propelled Howitzer (SPH) under the Product Manager for Self-Propelled Howitzer-Modernization program. Its main objective is to ensure the delivery of an advanced armored artillery system with high mobility, protection, and sustainment capabilities. The evaluation will lead to a Request for Proposal (RFP) for production, focusing on a series of test phases scheduled for fiscal year 2026 at Yuma Proving Ground, Arizona. The evaluation encompasses 10 test phases, including acceptance inspections, system operations demonstrations, physical and human factors evaluations, and a variety of firing and mobility tests. Key aspects involve assessing the howitzer's accuracy, rate of fire, compatibility with U.S. ammunition, and resilience under diverse climatic conditions. Each phase outlines specific vendor responsibilities and data outputs required for comprehensive analysis. This structured approach underscores the government’s commitment to enhancing military capabilities through rigorous testing and evaluation processes, ultimately facilitating informed decisions on production contracts for the SPH system.
    The document presents the "MATCE Input Datasheet Tracked Vehicles," which guides users in inputting data for tracked vehicles into the NATO Reference Mobility Model (NRMM). It outlines essential data fields, including vehicle dimensions, clearance specifications, performance metrics, and various component characteristics such as engine specifications and transmission details. Users are instructed to use English units and to provide comprehensive comments on units and data sources to ensure clarity. The structured dataset prompts detailed information on vehicle geometry, dynamics, and operational capabilities necessary for mobility analysis. Ensuring accuracy while entering this data is critical as it impacts the NRMM’s effectiveness in assessing vehicle mobility in various terrains. The document serves as a resource for contractors or government entities involved in evaluating military or transport vehicles, facilitating data standardization for improved operational assessments and research purposes within military frameworks.
    The document serves as a guideline for inputting data into the NATO Reference Mobility Model (NRMM) and Mobility Analysis Tool (MAT) for wheeled vehicles. It outlines the specific data requirements needed to assess vehicle mobility characteristics, including metrics such as center of gravity height, vehicle length, ground clearance, weight under traction assemblies, and various vehicular dimensions and specifications. Users are instructed to fill out data across a series of designated spreadsheet tabs, adhering to standard English units, while providing additional context for the gathered metrics in comment fields. Special attention is given to ensure values for both individual axles and overall vehicle configurations are correctly documented and that any entries diverging from standard measurement units are clearly noted. The document emphasizes the classification of data, underscoring the importance of handling filled spreadsheets as Controlled Unclassified Information (CUI). A well-structured data input is vital for accurate mobility modeling, which is essential for military and logistical assessments in support of NATO operations. This comprehensive approach facilitates interoperability and effective planning within different operational contexts across member nations.
    The "Cyber Survivability Endorsement (CSE) Implementation Guide" provides a framework to enhance the cybersecurity requirements for Department of Defense (DoD) weapon systems. It outlines a process for determining cyber survivability thresholds, emphasizing the need for integrating these requirements early in the capability development lifecycle. The guide promotes collaboration among various DoD committees and agencies to address recurring cybersecurity vulnerabilities and strengthen resilience against cyber threats. Key features include a structured approach to assess adversarial threats, mission types, and the impact of potential system failures. The guide encourages tailoring Cyber Survivability Attributes (CSAs) to specific systems, ensuring that all acquisition programs align with cyber survivability best practices, regardless of their pathway. Version 3.0 introduces expanded threat tiers, improved guidelines for cyber dependencies, and updated recommendations for managing vulnerabilities within hardware and software supply chains. The CSE framework aims to inform program managers and requirement sponsors about necessary cybersecurity measures throughout the acquisition process, ultimately fostering a culture of proactive cyber risk management and mission assurance across DoD systems. The document is valuable for requirements sponsors engaged in the Joint Capabilities Integration and Development System (JCIDS) process, urging a shift from mere compliance to a commitment to cyber survivability in all military capabilities.
    The document outlines the procedures for collecting and reporting data during artillery firing events as part of a standardized format known as the Round by Round (RxR) Template. It provides detailed instructions on how to accurately fill out the template, including entries for various parameters such as weapon settings, projectile specifications, and impact data. Each artillery round fired is documented with specific categories covering the location, settings, and measurements, ensuring all relevant metrics are captured in designated fields. The guide emphasizes the importance of noting any deviations, test incidents, or anomalies to maintain comprehensive records. Classified as Controlled Unclassified Information (CUI) once completed, the template underlines adherence to reporting standards necessary for federal defense operations. The overall aim is to facilitate systematic data collection and enhance operational accountability during live artillery exercises, ensuring compliance with federal reporting requirements.
    The document outlines the proposal submission process for a government RFP, specifically targeting the acquisition of a self-propelled howitzer vehicle system and related services. Offerors must adhere strictly to requirements outlined in the solicitation, including submitting detailed proposals in specified formats and volumes. Proposals must include factors such as maturity, technical performance, cost, small business participation, and administrative details, with specific instructions for each volume. The acceptance period for proposals is set at a minimum of 240 days, and any deviations could lead to rejection. Additionally, the document emphasizes the importance of a virus-free submission and guidelines for unclassified and potentially classified materials. Organizational conflicts of interest need to be disclosed, and offers must cover all requirements specified. The evaluation factors and their significance are detailed, fostering clarity for potential offerors on what is expected for successful proposals. This structured approach ensures thorough review and compliance with government procurement standards, reflecting the critical nature of transparency and accountability in federal contracting processes.
    The government intends to award approximately eight Firm Fixed Price contracts for the evaluation of a 155mm Self-Propelled Howitzer system. Proposals will be assessed based on five evaluation factors: Maturity, Technical Performance, Test Readiness, Cost/Price, and Small Business Participation, with specific importance assigned to each. The selection process involves a trade-off evaluation, where non-price factors will be weighed against costs to determine value. Offerors must meet several eligibility criteria, including price affordability, with a maximum price of $5 million for CLIN 0001. Proposals may be rejected for various reasons, including lack of compliance with instructions or financial irresponsibility. The Source Selection Authority will oversee the evaluation, which will not include discussions, emphasizing the importance of submitting the best initial proposal. Additionally, the government aims to promote small business participation, with specific percentage goals for different categories. Overall, the document outlines a structured process aiming to ensure responsible bidding while promoting affordability and encouraging small business involvement in government contracts.
    This document presents the Contract Data Requirements List (CDRL) for a Self Propelled Howitzer 155mm system, detailing various data items required from the contractor post-contract award. Each data item, such as the Reliability Report, Armor Suitability Report, and Power and Mobility Capabilities Report, outlines specific submission criteria, frequency, and required content, emphasizing digital format submission in English. Key requirements encompass testing summaries, incident documentation, reliability predictions, and maintainability assessments, along with safety analyses and operational capabilities. Contractors must provide thorough reports on system reliability, safety tests, maintenance requirements, and environmental assessments, often necessitating specific formatting and timelines for initial and subsequent submissions. These reports, driven by military standards and specifications, facilitate the government’s oversight and evaluation of weapon systems, ensuring they meet operational and safety standards. The overarching goal is to maintain high standards for performance and reliability, enhancing national defense capabilities. The CDRL thus serves as a crucial framework for contractor accountability and ensures compliance with military expectations throughout the procurement process.
    This document outlines the Contract Data Requirements List (CDRL) for the Self Propelled Howitzer (SPH) 155mm system, detailing data submission requirements from contractors. The CDRL consists of various data items, including the Fire Control Report, Quality Assurance Program Plan, Integrated Health Management System Report, and several others. Each data item specifies submission timelines, report content guidelines, and review processes involving both draft and final versions. Key items focus on reporting requirements such as the software architecture, quality assurance measures, networking integration, ammunition safety, and operational security training. The format of the submissions must be digital and in English, meeting certain authority documentation standards. Additionally, contractors are expected to facilitate meetings for collaborative review of submissions, ensuring compliance with government requirements. This CDRL sets the foundation for assessing the SPH’s capabilities while emphasizing compliance with military standards and ensuring operational readiness. The structured delivery of data fulfills the government’s need to oversee and validate the contractor’s processes, aligning with broader procurement strategies to enhance military asset performance.
    This Statement of Work (SOW) outlines the evaluation process for non-developmental, self-propelled 155mm howitzer artillery systems, led by the Project Manager Self-Propelled Howitzer Systems (PM SPHS). The goal is to identify an operationally acceptable solution ahead of a planned production contract by FY30. Contractors will participate in a nine-month evaluation at Yuma Proving Ground (YPG), Arizona, starting between August and October 2025. They must provide necessary equipment, reports, and personnel support throughout the testing process. Furthermore, requirements include conducting reliability and safety assessments, providing maintenance support, and ensuring compliance with security and training protocols. An extensive Contract Data Requirements List (CDRL) specifies detailed reporting obligations covering performance, safety, environmental impact, and technical data. The document emphasizes strict adherence to security standards, data classification, and export control regulations. The summary highlights the commitment to acquiring a superior howitzer system crucial for effective military operations.
    Lifecycle
    Similar Opportunities
    Manufacture of the M776 155mm Cannon Tubes
    Active
    Dept Of Defense
    The Department of Defense, through the Army Contracting Command at Picatinny Arsenal, is conducting a market survey to identify potential sources for the domestic manufacture of the M776 155mm cannon tubes. The objective is to gather information on the capabilities of vendors to produce these cannon tubes in specified quantities and lead times, as they are critical components of the 155mm M777A2 Towed Howitzer used by the Army. Interested vendors are required to provide detailed information regarding their manufacturing experience, production processes, capacity, and capabilities related to the M776 cannon tubes. Responses must be submitted within 30 days of this notice via email to the designated contacts, Megan Ross and Peter Snedeker, with no cost or obligation to the government.
    155mm Modular Artillery for Combat Effectiveness (MACE)
    Active
    Dept Of Defense
    The Department of Defense, specifically the U.S. Army Contracting Command-New Jersey, is conducting a market survey to identify solutions for the 155mm Modular Artillery for Combat Effectiveness (MACE) projectile body. The objective is to develop a low-cost projectile capable of delivering various lethal and nonlethal payloads over distances of 30 to 35 kilometers when fired from 39-caliber artillery systems, with potential production rates reaching up to 150,000 units annually. This initiative is critical for enhancing combat effectiveness and ensuring compatibility with both legacy and future artillery systems. Interested parties must submit their responses by January 13, 2025, and can direct inquiries to Mary O'Connell or Eric J. Wagner via the provided email addresses.
    M777 Digital Fire Control Hardware
    Active
    Dept Of Defense
    The Department of Defense, through the Army Contracting Command New Jersey (ACC-NJ), is conducting a market survey to identify potential sources for the procurement of M777 Digital Fire Control Hardware. The procurement includes various components such as the Mission Computer 11 (MSC-11) and Chief of Section Display 11 (CSD-11), with a total quantity of up to 800 units for each item specified. This hardware is critical for artillery systems, enhancing operational capabilities and precision in military applications. Interested vendors are required to submit their capabilities, including management plans and cost estimates, by January 16, 2025, to Daniel Rakauskas at daniel.s.rakauskas.civ@army.mil, with all submissions to be made electronically.
    Synopsis/Solicitation for M739A1 Point Detonating/Delay (PD/DLY) Fuze
    Active
    Dept Of Defense
    The Department of Defense, specifically the U.S. Army Contracting Command – New Jersey, is seeking proposals for the manufacture and delivery of the M739A1 Point Detonating/Delay (PD/DLY) Fuze, which is critical for 105mm and 155mm artillery projectiles. This procurement aims to secure up to two contracts, with one reserved for a Small Business, under a five-year Indefinite Delivery, Indefinite Quantity (ID/IQ) framework, with a maximum value of $712,480,000 and a guaranteed minimum of $1,000,000. The M739A1 PD/DLY Fuze plays a vital role in artillery operations, featuring an Impact Delay Module for precise detonation timing. Interested parties should note that the formal Request for Proposal (RFP) is anticipated to be released in the second quarter of Fiscal Year 2025, and they can contact Michael Kline or Jennifer Hughes for further information.
    155mm M232-series Modular Artillery Charge System (MACS) M31 Type Triple Base Propellant
    Active
    Dept Of Defense
    The Department of Defense, specifically the U.S. Army Contracting Command-New Jersey, is conducting market research to identify potential sources capable of manufacturing and delivering the M31 Type Triple Base Propellant, a critical component of the 155mm M232-series Modular Artillery Charge System (MACS). The procurement aims to secure a reliable supply of approximately 350,000 pounds per month, with the capability to surge up to 2,226,000 pounds per month, to meet requirements from fiscal years 2026 to 2031. This propellant is essential for various artillery applications, providing a complete zoning solution for 155mm artillery systems. Interested parties must submit their capabilities and relevant information by January 6, 2025, to the designated contacts, Cameron Sacco and John C. Scott, via email, and must be registered in the System for Award Management (SAM) to participate.
    Notice of Intent to Sole Source- Multi-Domain Artillery Cannon (MDAC)/Hypervelocity Projectile (HVP) under Other Transaction Agreement (OTA)
    Active
    Dept Of Defense
    The Department of Defense, specifically the U.S. Army Rapid Capabilities and Critical Technologies Office (RCCTO), intends to award a sole-source contract to BAE Systems Land & Armaments L.P. for the development of prototypes for the Multi-Domain Artillery Cannon (MDAC) and Hypervelocity Projectile (HVP) under an Other Transaction Agreement (OTA). The objective is to deliver a complete Multi-Domain Artillery Cannon System Battery by the fourth quarter of fiscal year 2027, which will include multiple artillery cannons, radars, battle managers, and hypervelocity projectiles to enhance defense capabilities against various aerial threats. This initiative is critical for the Army's mission to protect fixed and semi-fixed locations from advanced air and missile threats, and it is based on market research indicating that BAE Systems is the only responsible source capable of meeting the required timeline. Interested vendors must submit any new capability statements by 1:00 PM EST on January 4, 2025, to the Agreements Officer, Joshua Flinn, at joshua.e.flinn.civ@army.mil.
    36 each M88A3 Heavy Equipment Recovery Combat Utility Lift and Evacuation System (HERCULES) vehicles and associated Authorized Stockage List / Initial Stockage List spares.
    Active
    Dept Of Defense
    The Department of Defense, specifically the Department of the Army, is soliciting proposals for the procurement of up to 36 M88A3 Heavy Equipment Recovery Combat Utility Lift and Evacuation System (HERCULES) vehicles, along with associated Authorized Stockage List (ASL) spares and repair of Defective Government Material (DGM) from BAE Systems on a sole source basis. This procurement is critical for maintaining the operational readiness and effectiveness of military recovery operations, as the HERCULES vehicles are essential for the recovery and evacuation of disabled armored vehicles in combat scenarios. Interested parties are encouraged to express their interest and capability to respond to this requirement, noting that the Technical Data Package is source controlled and non-competitive. For further inquiries, interested vendors can contact Jeffrey Schoenherr at jeffrey.d.schoenherr.civ@army.mil or by phone at 586-945-7442.
    M1E3 Engineering Change Proposal
    Active
    Dept Of Defense
    The Department of Defense, specifically the Army Contracting Command Detroit Arsenal (ACC-DTA), intends to award a contract for the M1E3 Engineering Change Proposal (ECP) to General Dynamics Land Systems (GDLS) on a sole source basis. This seven-year hybrid cost-type contract aims to develop a new variant of the Abrams Main Battle Tank, designated as the Abrams M1E3. The procurement is critical for enhancing the capabilities of military armored vehicles, ensuring that the U.S. Army maintains its technological edge in defense operations. Interested parties can reach out to Shalonda Hawkins at shalonda.l.hawkins.civ@army.mil or John Finn III at john.j.finn75.civ@army.mil for further details.
    Market Survey: 120mm, Advanced Tungsten Armor Piercing, Fin Stabilized, Discarding Sabot with Tracer (APFSDS-T) KE-W (Kinetic Energy with Tungsten) A4 cartridges
    Active
    Dept Of Defense
    The Department of Defense, specifically the U.S. Army Contracting Command, is conducting a market survey to identify potential sources for the production of 120mm Advanced Tungsten Armor Piercing, Fin Stabilized, Discarding Sabot with Tracer (APFSDS-T) KE-W A4 cartridges. The procurement aims to acquire approximately 760 qualification cartridges that must meet specific performance specifications and be compatible with the M256 cannon or equivalent weapon systems. This initiative is crucial for enhancing the Army's ammunition capabilities, and interested firms are invited to submit detailed technical solutions, production capabilities, and relevant experience within 30 days of this announcement. For further inquiries, interested parties can contact Emmanuel Perez at emmanuel.f.perez.civ@army.mil or Erick Martins at erick.d.martins.civ@army.mil.
    Army Contracting Command – Red River Army Depot (ACC-RRAD) Organic Industrial Base (OIB) Modernization Commercial Solutions Opening (CSO)
    Active
    Dept Of Defense
    The Army Contracting Command – Red River Army Depot (ACC-RRAD) is seeking proposals for the design, manufacture, and installation of a Road Wheel Drum Tester as part of its Organic Industrial Base (OIB) Modernization initiative under the Commercial Solutions Opening (CSO) W911RQ-24-S-C0001. This procurement aims to enhance the quality testing process for military vehicle road wheels, ensuring compliance with military specifications while improving safety and reducing operational costs. The desired tester must meet specific technical requirements, including a drum diameter of 67.23 inches, adjustable pressure settings, and the capability to test two road wheels simultaneously, integrated with advanced software for data processing. Interested parties must submit a solution brief by 5:00 P.M. CDT on 10 August 2024, and are advised to register with the System for Award Management. For further inquiries, contact the CSO Inbox at usarmy.rrad.acc.mbx.cso@army.mil.